Visiting Road Projects in The Neighborhood

Since I've been concentrating efforts to chronicle the building of I-74 in SE NC and the re-signing of the Greensboro Loop over the past year, I have not focused on NCDOT and other road projects basically going on in my back yard. There are three, two if you count by contract number. These are the replacing of bridges along Garrett Road just south of US 15/501. The widening of 15/501 and bridge replacement over the New Hope Creek, and the building of a roundabout at the Durham headquarters for Blue Cross/Blue Shield of NC.

1. Garrett Road Bridge Replacements-This has been going on over the past year. Two temporary bridges and roads connecting them were created so the old bridges could be demolished and new bridges built. The new bridges have opened to traffic over the past few weeks. Here's a look at the construction area heading north on Garrett:
The cleared area on the right was where the temporary road/bridge was located, traffic then went to the left of the other bridge making this part of Garrett more a slalom course than a road.

The trouble with bridge building these days is that they are done with the lowest cost in mind with usually no thoughts of adding distinguishing features:
Is this the first bridge heading northbound or the second? Its the first, but is this also the first?:
The background is the only thing that indicates it's the second. Once they add another asphalt layer this project should be done. As part of the project, they also are re-doing the Garrett Road/15-501 intersection, as this sign warns:
They are demolishing the old intersection of the 15-501 Service Road with Garrett Road and rerouting it behind the Room Store building and back to its old alignment:
This removes traffic delays caused by left turners trying to use the Service Road while cars on Garrett are waiting for a green light, and the many close calls of people driving down 15-501 north not stopping going across Garrett to the Service Road.

2. US 15/501 Widening and Bridge Replacement
As part of the same contract, NCDOT is widening the only remaining 4-lane section of US 15/501 between Garrett and I-40 and replacing the bridge over the New Hope Creek. This is a view of the construction area from 15/501 South:
The southbound lanes have been shifted onto a temporary roadway and bridge while the northbound traffic is using the former southbound lanes while the existing 2-lane northbound bridge is being demolished and replaced with a 3-lane higher span bridge.
This is driving on the temporary southbound lanes past the temporary bridge. The former northbound lanes on the left have been totally demolished and are being expanded and regraded.
The future 3rd southbound lane beyond the jersey barriers for now are currently being used for equipment storage. More progress can be seen heading on 15/501 northbound:
Though hard to see because of the barriers the future third lane is being graded heading down toward the future bridge seen below:
Beyond the crane you can see metal bridge decking is being added to the new bridge and beyond, to help expedite the moving of heavy equipment to the bridge, the road bed has received its first coats of asphalt. The bridge will be higher than the previous one because Durham officials demanded it be constructed to keep an open wildlife corridor along New Hope Creek. Since then they've approved new developments on both sides of the creek making the wildlife corridor even narrower and the bridge design more essential.

3. The Blue Cross/Blue Shield Roundabout
If your a member of BC/BS of NC and wondered where all their surplus money reported in the news has been going, well, at least some has been used at their Durham headquarters. They've built another new building at their University Commons location and, since they're running out of space to place more buildings in that spot, have acquired more office space at the University Place Mall further west on University Drive. So they can keep employee traffic off of University this has led to the construction of a road to connect the two office complexes. The designers felt the intersection of the existing and new roads would be a good place for a roundabout:
This is approaching the roundabout from University Drive a couple blocks west of its intersection with the Martin Luther King Parkway. The new road is off to the right.
The road has not been completed yet. Sidewalks were put in last week. This week could see the first asphalt being placed on the roadbed. The buildings of University Place can be seen at the top right. The roundabout has been open for about two months with only the original road using it.
This is looking at the roundabout from the completed end of the new road which, as of now, does not have a name, just a road sign saying 'To University Place' and an arrow. Beyond is one of the new buildings put up in the last two years. The last photo is the view going west and coming from the University Commons shopping center and my Harris Teeter:
My next entry will be photos taken along the path of the future Triangle Parkway.

Comments

Popular posts from this blog

West Canyon Road (Snow Canyon State Park)

West Canyon Road is an approximately four-mile dirt service road located in Snow Canyon State Park.  West Canyon Road follows Snow Canyon from the Whiptail Trail to the northern State Park boundary and intersects numerous trailheads.   West Canyon Road was the original main road through Snow Canyon after it was designated as a Utah State Park in 1957 and opened to the public in 1962. Part 1; the history of West Canyon Road Snow Canyon is located in the Red Mountains north of the city of Ivins in Washington County, Utah.  Snow Canyon is one of many sandstone canyons located in the Red Mountains.  Part of the extinct Santa Clara Volcano punctured the Red Mountains via lava tubes. From approximately the year 200 to 1,250 the area around Snow Canyon was inhabited by the Ancestral Puebloans.  Mormon pioneers established Santa Clara south of Snow Canyon in 1854.  Local legend has it that the settlers discovered Snow Canyon in the 1850s while searching for m...

Indian Gulch Extension and the Indian Gulch ghost town site

Indian Gulch Extension is an approximately 6-mile-long rural highway corridor in the Sierra Nevada foothills of western Mariposa County.  Indian Gulch Extension begins at Indian Gulch Road near the namesake ghost town of Indian Gulch.  From the ghost town site Indian Gulch Extension extends southwesterly to the Merced County line where it becomes Waltz Road.   The former Gold Rush era community of Indian Gulch which was settled near Santa Cruz Mountain in 1849 and had standing structures until the early 1970s.  What is now Indian Gulch Extension was approved for construction by the Mariposa County Commissioners in 1862.  The purpose of the corridor was to provide Indian Gulch with a direct connection westward with the greater Stockton-Los Angeles Road.  The Stockton-Los Angeles Road would go onto define much of the Mariposa County and Merced County line.  Part 1; the history of Indian Gulch and Indian Gulch Extension Indian Gulch Road is named aft...

The reemergence of US Route 99 at the Ventura Freeway/Golden State Freeway interchange

During April 2023 a portion of the sign gantry on the eastbound Ventura Freeway (California State Route 134) approaching the Golden State Freeway (Interstate 5) fell.  The fallen portion of the sign gantry revealed a once covered US Route 99 shield.  The uncovered US Route 99 sign (blog cover courtesy Ian Ligget) is a 1956-63 era freeway specification US Route shield.  This blog will explore in brief how the Golden State Freeway was developed as US Route 99 and US Route 6 before becoming solely Interstate 5.   This blog is part of the larger Gribblenation US Route 99 Page.  For more information pertaining to the other various segments of US Route 99 and it's three-digit child routes check out the link the below. Gribblenation US Route 99 Page Part 1; visiting the US Route 99 shield at the Ventura Freeway/Golden State Freeway Interchange As noted in the introduction the US Route 99 shield can be seen on the eastbound Ventura Freeway (California Sta...