Skip to main content

If It's Friday, It Must Be (A Trip to) Goldsboro

Since the Greensboro signing changes are coming to an end, and I have other people supplying me with photos now, I decided to take a quick roadtrip the other direction today. Since NCDOT has released its final report on I-795 and announced reconstruction could start as early as next month, I decided to ride the rough road the last time and see if any other changes (signage, mileposts, exit numbers) had changed since my last visit in January.

The quick (and small) answer was no. Everything, except the road surface, was unchanged from when the signs went up in November 2007. Even the hard to see South I-795 to the right sign at the still marked US 117 exit is still there. But I did find some other new things to tell and show.

1. The US 64/264 'exit to nowhere' is almost complete. They were working on tying the completed westbound exit ramps to the highway when I passed by. Fortunately, I was going east because the two right lanes westbound were closed and traffic was backed up to the Business 64 exit (guess what I used on the way back). The signage is up, but covered over. Here's a couple sign photos heading east:
The sign above is at the one-mile mark. While below is at the eastbound exit ramp:
2. New mileposts along US 264. While they are resurfacing US 64/264 in Wake County, they have added mileposts and exit numbers to the 264 exits in Nash County. Previously the numbers didn't start until entering Wilson County a few miles from I-95.
The mileposts start at 23. The first new numbered exit is NC 231, which is Exit 27 (I know looking into the sun and hard to read) the exit signs before the ramps have no numbers, they are just on the gore signs.
The next exit for NC 581 is now numbered 30. If you need any further proof, here's the mile marker before the exit:
The next exit is Exit 34, Sims and is in Wilson County, the first sign is before the county line, so I don't know if it had a number previously:
Based on mileage calculation from the given mileposts the exits in Wake County, when numbered would probably be (going westbound) 22 for NC 39/Bus 264, 21 for NC 97 and 20 for US 64 East (or 20B for the NC 97 and A for the US 64, if you wanted to be exact).

3. Progress on the new US 70 Goldsboro Bypass
I-795 is still down to one-lane through the construction zone for the new US 70 Bypass. Progress has been made in building up the grades for the bypass and exit ramp bridges.
Approaching the construction zone, there will be three separate bridges across I-795.
The bridge piers for the US 70 highway itself.
One of the pieces of construction equipment bringing the grade up to bridge level.

4. The soon to be tree-less end of NC 540 West:
With the groundbreaking on the Triangle Parkway less than a week away, I thought I'd take this shot before the construction equipment appeared to extend the freeway. I noticed no construction equipment on NC 540 itself, but there were a few probably survey trucks on what now makes up the future ramp from East NC 540 to NC 55 East.

5. Misc.
For those who wanted to see an I-795 sign photo:
On the road going west from Pikeville (I drove US 117 starting back to see if there were any alternate US 117 signs, there were not, but they probably never were put up).

And, finally for those who haven't seen the End I-73 North sign I have on my I-73 Segment 5 page, another version, courtesy of Evan Semones:
I will return to I-795 once I've learned the reconstruction project is finished, which NCDOT says should be December.

Comments

Popular posts from this blog

The case to move Interstate 73 in Southern Ohio onto US 33

Every decade or so, Ohio pushes to revisit the proposed Interstate 73 that would connect Michigan to Myrtle Beach, South Carolina.  It's been happening since Congress legislated the route in 1991.  Within Ohio, Interstate 73 generally follows the US 23 corridor from Portsmouth through Columbus to Toledo, and into Michigan. Since High Priority Corridor Five was created , Ohio has really done nothing to move forward with Interstate 73.  Sure, there have been feasibility studies here and there.  But actual dollars and construction just haven't occurred. The US 33 Nelsonville Bypass appears to have been built to Interstate standards. However, Ohio has been slowly upgrading US 33 to a full freeway through Southeastern Ohio.  Bypasses of Lancaster and Nelsonville opened in 2004 and 2013, respectively.  Other sections of two-lane road are being twinned, some to freeway or, at a minimum, to expressway standards.  Currently, a $274 million widening project in...

Local Sign Find - The last remnant of Business Interstate 95 between Kenly and Rocky Mount , NC

As you head north on Interstate 95 at Exit 107 for Kenly and US 301, you'll notice something odd about the overhead sign for the exit.  Peeling off the sign for all that can see is the word 'NORTH' off-center from the US 301.  This old sign (probably close to original from when this section of I-95 opened - more on that in a little bit) gives a hint to a short-lived Business Interstate Route that ran from here to Rocky Mount. The last hint of the Kenly-Wilson-Rocky Mount Business I-95 (Shaun White - August 2020) Interstate 95 in North Carolina has a unique history.  But one of the overlooked and forgotten pieces of Interstate 95 in North Carolina is the 38 mile section between Kenly and Rocky Mount.  When opened to traffic in late 1978, it was the next to last piece of Interstate 95 in North Carolina to open replacing a four lane US 301 from Battleboro through Rocky Mount and Wilson to eventually tying back into the Interstate in Kenly. Though it was not delayed in l...

Nostalgia fast food with style - Returning to Rax

Nostalgia. It sells. It evokes, and more accurately, warps memories of days gone by.  Things were better, simpler, and we eat it up. Nostalgia can make you drive three hours and over a hundred miles out of your way just to reconnect with a dying fast-food restaurant you last enjoyed in the early to mid-90s.  That person was me - that restaurant was Rax. I could go on about Rax's history, but in short, Rax was briefly a very popular roast beef fast-food chain.  Growing up in the 80s and early 90s in Western PA, Rax was the good fast-food spot.  The milkshakes.  (Personally, the chocolate chip milkshake was heaven.)  Uncle Alligator Kids Meal with the chocolate chip cookie. Take that McDonald's Happy Meal!  The fancy salad and hot foods bar.  Going to Rax was special.  Like so many similar restaurants, various investments, management decisions, etc., led Rax to almost disappear overnight.  By the time I graduated college in late 1999, abou...