Skip to main content

Freeway Signing in Greensboro: The Saga Continues

Today's Raleigh N&O's Road Worrier column is devoted to driver confusion caused by the re-signing along Greensboro freeways due to I-40 being put back on its old alignment:

http://www.newsobserver.com/news/story/1660986.html

In the article an NCDOT traffic engineer, Kelvin Jordan, admits the I-40 East interchange with I-73 on the west side of town is confusing with those needing to stay on I-40 having to exit the main highway. However, since the interchange was designed when I-40 was to use the Loop, it's understandable. He also says that NCDOT is considering removing the Business 85 designation through Greensboro in the future as well. From the article:

"Getting through Greensboro will be easier now, Jordan said, with just one I-40 and no Business 40.

But DOT may never finish trying to untangle Greensboro's Urban Loop.

There are more plans to simplify markers at the three main approaches to the city. And there's still the confusion of two freeways called 85. DOT could decide one day to get rid of Business 85, too.

'I won't say that change won't come at some point," Jordan said. "That is something we will look at, but it won't be changed in the next year or two.'"

See the URL for the entire article.

Commentary
I was interviewed for the piece and suggested they should have given Business 85 perhaps a 3di number, in the first place since having two highways with the same number, is naturally confusing. I guess I wasn't confused enough as a driver to be quoted for the article, however.

Business 85 was conceived when I-85 and I-40 were to use the Loop, leaving the freeway east of Death Valley with no designation. With the I-40 re-routing this is no longer the case and only adds another route between the US 29 and I-40 interchanges which, even with the rerouting of US 421 is still also I-40, US 29, US 70 and US 220. South of the I-40 split the Business 85 route does have other designations, US 29/70, for the three miles or so back to I-85.

The questions I would ask are: if an NCDOT traffic engineer is mentioning removing Business 85 sometime in the future, why was this not thought of, or thought of and not done, at the same time they were (I guess they still are) re-signing the original I-40 route? Isn't the new NCDOT supposed to be more efficient and cost sensitive?

My solution would try to solve two problems with one new route number and possibly provide NCDOT with additional money in the process. The 2 biggest with how the highways are signed now are that people are supposedly confused due to the two 85 routes, and drivers are also confused about how to get to US 220 South (Future I-73) from I-85 North. You can't get there on the I-85 Loop but have to exit onto Business 85 travel a mile or so north and then take the US 220 South exit. I would remove the Business 85 designation completely through Greensboro, I would then replace it south of US 220 with a new 3di, I-273 (To I-73, too obvious?) which would travel with US 29/70 to the US 220 exit and then back south on US 220 to the Loop and I-73. NCDOT could then claim interstate maintenance money for the route like they did by putting I-40 on its original alignment. As to the argument that the route is not up to modern interstate standards, so are parts of I-40 through Death Valley, yet the FHWA let NCDOT move I-40 back anyway. The Business 85 part was also marked as I-85 for decades.

Trying to figure out why NCDOT does the things it does is sometimes frustrating, but it always makes life interesting for those interested in roads in North Carolina.

Comments

Anonymous said…
They should have signed it I-685 for the business 85 in Greensboro. Since it is a loop and it will make the road more qualifying for federal money.

The sign heading to Greensboro from I-85 should read "I-685 North, US 29 North, US 70 East (TO US 220 South/I-73 South)

BUT the one thing of all.. they should have signed I-73 along US 220 anyways (even if some stretch is not interstate standards)
Bob Malme said…
Looks like there's some progress on completing the signage work. I-73/US 421 in both directions was closed during the midday hours today for what was described as sign installation. This may mean the last I-40/I-73 sign on the SW portion of the Loop has been updated.

Also in looking at the traffic cameras on the I-85 portion, I believe that one of the former green signs that had both I-40 and I-85 on it, now just has a centered I-85. I guess they decided not to waste the signage already up there by replacing it with a stand alone I-85 shield on a signpost.
Bob Malme said…
The I-73 closings were lanes near Wendover Avenue. The I-85 sign was heading southbound on the portion north of the US 421 interchange.

Popular posts from this blog

Did Caltrans just kill the G26 cutout US Route shields?

The US Route System was formally created by the American Association of State Highway Officials during November 1926.  Through the history of the system the only state to which has elected to maintain cutout US Route shields has been California.  The G26 series cutout US Route shields have become a favorite in the road enthusiast hobby and are generally considered to be much more visually pleasing than the standard Federal Highway Administration variant.  However, the G26 shield series appears to have been killed off on January 18, 2026, when Caltrans updated their Manual of Uniform Traffic Control Devices.  This blog will examine the history of the US Route shield specifications in California and what is happening with the 2026 changes.  The blog cover photo is facing towards the terminus of California State Route 136 and at a G26-2 specification US Route 395 shield.  In the background Mount Whitney can be seen in the Sierra Nevada range.   ...

May 2023 Ontario Trip (Part 3 of 3)

  Over the years, I have made plenty of trips to Ontario, crisscrossing the southern, central and eastern parts of the province. Living in Upstate New York, it's pretty easy to visit our neighbor to the north, or is that our neighbor to the west? Ottawa is one of my favorite cities to visit anywhere in the world, plus I've discovered the charm of Kingston, the waterfalls of Hamilton (which is on the same Niagara Escarpment that brings us Niagara Falls), the sheer beauty of the Bruce Peninsula, and more. But I hadn't explored much of Cottage Country. So I decided to change that, and what better time to go than over Memorial Day weekend, when the daylight is long and I have an extra day to explore. On the third and final day of my trip, I started in Huntsville and made my way through Muskoka District and Haliburton County, passing by many lakes along the way. I stopped in towns such as Dorset, Haliburton and Bancroft before making a beeline down to Belleville and then over th...

Ghost Town Tuesday; Nichols, FL

A couple years ago I spent a lot of spare time exploring phosphate mining ghost towns in the Bone Valley of Polk County, Florida.  One ghost town in particular called Nichols on Polk County Route 676 west of Mulberry caught my eye due to a relative lack of documentation on ghosttowns.com. Nichols was created in 1905 during the early phosphate mining boom in the Bone Valley region.  For the time Nichols was unusual since it had company housing in the Nichols Mine site and private residences outside the gate.  Nichols is only about two miles west of Mulberry which probably made it a somewhat reasonable commute even by the wonky standards of the early 20th Century.  Most of the Bone Valley region was relatively remote which made commuting or homesteading impractical which is why there are so many ghost towns in the area.  The company housing section of Nichols was phased out and abandoned by 1950. The Nichols town site is largely abandoned and could "possibl...