Skip to main content

North Carolina's Amtrak Expansion to Asheville Comes into Focus

North Carolina's push to expand its intercity passenger rail system continues to move forward with the completion of a recent feasibility study on a westward expansion from Salisbury to Asheville.

The study paints a more specific picture of how the new service will run.  The study proposes three daily round trips from Salisbury to Asheville.  The study projects 100,000 annual riders.  The 3 hours and 25 minutes ride from Salisbury would include stops at Statesville, Hickory, Morganton, and Marion.  The estimated cost to get the route up and running is $665 million. (1)

The targeted date for train service to begin to Asheville is 2035.

The study is the first step in North Carolina's aggressive plan to expand its Amtrak service west and east.

With the study completed, there are still several questions about the service.  The first question is: will any of the three round trips include a direct Raleigh-to-Asheville run?  Or will all passengers need to change trains in Salisbury?

Salisbury Junction and Salisbury Station (Federal Railroad Administration).

Another question is what upgrades would be made to Salisbury Junction.  The junction, which sits just north of the current Salisbury passenger station, is where trains to and from Asheville connect to the main line between Charlotte and Raleigh.  A 2004 study of the Richmond-to-Charlotte rail corridor stated that a series of improvements at Salisbury Junction are needed to allow higher-speed trains to run north-south through the junction.  It's safe to assume that further upgrades at Salisbury Junction would be needed for trains running east-west to and from Asheville.

The passenger area at Salisbury's Amtrak Station (Adam Moss).

Salisbury's historic passenger station is poised to handle the extra traffic.  The station, built in 1908, has considerable room for expansion for additional tracks and platforms.  Currently, an expansion to add a second platform at the Salisbury station is underway with completion planned for 2024.   The same 2004 study mentioned that the station has room for additional track space for passenger service to Asheville.

Other News:

North Carolina is also looking at possibly expanding rail into Northeastern North Carolina from Raleigh to Greenville.  A feasibility study for this corridor began in 2022.  Currently, Greenville area residents can access the Wilson Amtrak station via the Amtrak Thruway shuttle bus service.

Amtrak recently completed a full overhaul to the Gastonia station.  The station, which only sees under 750 boardings a year (FY 2021), saw numerous upgrades for safety and accessibility.  The Gastonia station is served daily by the Crescent Line.

Sources & Links:




Comments

Popular posts from this blog

West Canyon Road (Snow Canyon State Park)

West Canyon Road is an approximately four-mile dirt service road located in Snow Canyon State Park.  West Canyon Road follows Snow Canyon from the Whiptail Trail to the northern State Park boundary and intersects numerous trailheads.   West Canyon Road was the original main road through Snow Canyon after it was designated as a Utah State Park in 1957 and opened to the public in 1962. Part 1; the history of West Canyon Road Snow Canyon is located in the Red Mountains north of the city of Ivins in Washington County, Utah.  Snow Canyon is one of many sandstone canyons located in the Red Mountains.  Part of the extinct Santa Clara Volcano punctured the Red Mountains via lava tubes. From approximately the year 200 to 1,250 the area around Snow Canyon was inhabited by the Ancestral Puebloans.  Mormon pioneers established Santa Clara south of Snow Canyon in 1854.  Local legend has it that the settlers discovered Snow Canyon in the 1850s while searching for m...

Indian Gulch Extension and the Indian Gulch ghost town site

Indian Gulch Extension is an approximately 6-mile-long rural highway corridor in the Sierra Nevada foothills of western Mariposa County.  Indian Gulch Extension begins at Indian Gulch Road near the namesake ghost town of Indian Gulch.  From the ghost town site Indian Gulch Extension extends southwesterly to the Merced County line where it becomes Waltz Road.   The former Gold Rush era community of Indian Gulch which was settled near Santa Cruz Mountain in 1849 and had standing structures until the early 1970s.  What is now Indian Gulch Extension was approved for construction by the Mariposa County Commissioners in 1862.  The purpose of the corridor was to provide Indian Gulch with a direct connection westward with the greater Stockton-Los Angeles Road.  The Stockton-Los Angeles Road would go onto define much of the Mariposa County and Merced County line.  Part 1; the history of Indian Gulch and Indian Gulch Extension Indian Gulch Road is named aft...

The reemergence of US Route 99 at the Ventura Freeway/Golden State Freeway interchange

During April 2023 a portion of the sign gantry on the eastbound Ventura Freeway (California State Route 134) approaching the Golden State Freeway (Interstate 5) fell.  The fallen portion of the sign gantry revealed a once covered US Route 99 shield.  The uncovered US Route 99 sign (blog cover courtesy Ian Ligget) is a 1956-63 era freeway specification US Route shield.  This blog will explore in brief how the Golden State Freeway was developed as US Route 99 and US Route 6 before becoming solely Interstate 5.   This blog is part of the larger Gribblenation US Route 99 Page.  For more information pertaining to the other various segments of US Route 99 and it's three-digit child routes check out the link the below. Gribblenation US Route 99 Page Part 1; visiting the US Route 99 shield at the Ventura Freeway/Golden State Freeway Interchange As noted in the introduction the US Route 99 shield can be seen on the eastbound Ventura Freeway (California Sta...