Skip to main content

Interstate 895 through the Baltimore Harbor Tunnel


The Baltimore Harbor Tunnel is a component of Interstate 895 in the city of Baltimore, Maryland.  The Baltimore Harbor Tunnel spans a distance of 7,650 feet under the waters of the Patapsco River.  The Baltimore Harbor Tunnel opened to traffic on November 29, 1957, as part of the Harbor Tunnel Thruway.  The Baltimore Harbor Tunnel and Harbor Tunnel Thruway were designated as Interstate during 1979.  Prior to the completion of Interstate 95 and the Fort McHenry Tunnel during 1985 the Baltimore Harbor Tunnel was part of the primary route for north/south traffic passing through Baltimore.  


Part 1; the history of the Baltimore Harbor Tunnel

During 1938 and 1944 the Maryland State Road Commission conducted feasibility studies regarding constructing a bridge over the Patapsco River southeast of Baltimore Harbor.  During 1947 the Maryland General Assembly passed an act to allow financing for the Patapsco River Crossing to be funded from toll revenues from the Potomac River Bridge, Susquehanna River Bridge and incomplete Chesapeake Bay Bridge.  A feasibility study during 1953 examined three potential crossings for the Patapsco River crossing and considered if it should be a bridge or tunnel.  During 1954 the Maryland State Road Commission opted to construct the Patapsco River Crossing as a tunnel between Baltimore neighborhoods of Canton and Fairfield. 

Construction of the Patapsco River Tunnel would commence on April 7, 1955.  The Patapsco River Tunnel was designed by New York engineering firm Signstad & Baillie.  The Patapsco River Tunnel was constructed out of 21 segments of 310-foot-long tunnel.  The first segment of the Patapsco River Tunnel was sunken into place on April 11, 1956.  

The planned routing of the Patapsco River Tunnel can be seen on the 1956 Shell Highway Map of Baltimore.  

The Patapsco River Tunnel segments were covered with rock fill via a cut and cover method during construction.  The Patapsco River Tunnel would be rebranded as the Baltimore Harbor Tunnel upon being opened to traffic on November 29, 1957.  The Baltimore Harbor Tunnel was part of the initial segment of the Harbor Tunnel Thruway between US Route 40/Pulaski Highway south to the planned Glen Burnie Bypass.  The Baltimore Harbor Tunnel and Harbor Tunnel Thruway permitted a bypass of downtown Baltimore and 51 traffic lights. 

The completed Baltimore Harbor Tunnel and initial segment of the Harbor Tunnel Thruway can be seen on the 1961 United States Geological Survey Map of Baltimore.  


During 1961 the Harbor Tunnel Thruway was extended north to the Northeast Expressway (Interstate 95).  During 1973 the Harbor Tunnel Thruway was connected to Interstate 95 south of Baltimore.  Given Interstate 95 through Baltimore had not yet been completed the Harbor Tunnel Thruway was the de facto limited access highway through Baltimore.  The Baltimore Harbor Tunnel and entire Harbor Tunnel Thruway were designated as non-chargeable Interstate 895 during 1979.  

Interstate 895 appears on the Harbor Tunnel Thruway for the first time on the 1979/1980 Maryland Official Highway Map.  


The Fort McHenry Tunnel opened during November 23, 1985, which completed Interstate 95 through Baltimore.  The completion of the Fort McHenry Tunnel shifted most of the traffic through Baltimore off Interstate 895 and the Baltimore Harbor Tunnel.



Part 2; a drive on Interstate 895 through the Baltimore Harbor Tunnel

Interstate 895 southbound can be accessed from Interstate 95 southbound Exit 62 at the eastern city limit of Baltimore. 







Interstate 895 southbound Exit 14 accesses Moravia Road. 



Interstate 895 southbound Exit 12 accesses Lombard Street which is last exit before the Baltimore Harbor Tunnel toll.  Traffic is advised of the $3.00 toll for E-Zpass users ahead through the Baltimore Harbor Tunnel. 





Interstate 895 southbound crosses under Interstate 95 and enters the Baltimore Harbor Tunnel.












Upon emerging from the Baltimore Harbor Tunnel, Interstate 895 passes through a cashless toll gantry.  The pay-by-mail price to use the Baltimore Harbor Tunnel is noted on signage to be $6.00. 







Interstate 895 southbound Exit 8A and 8B access Frankfurst Avenue.  



Interstate 895 southbound crosses over a CSX Transportation railroad yard via a K-Truss Bridge and approaches Exit 7.  Interstate 895 Exit 7 is signed as accessing Potee Street.  










Interstate 895 southbound enters Brooklyn Park and junctions the unsigned Interstate 895A at Exit 6.  Interstate 895A exit signage directs traffic to Interstate 97 and Maryland Route 2.  



Interstate 895 southbound crosses the Patapsco River a second time and enters Lansdowne.  Interstate 895 intersects Maryland Route 295/Baltimore-Washington Parkway at Exit 4.  






Comments

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...