Campus Parkway (Merced, California)

Campus Parkway is a 4.5-mile expressway corridor located in and around the city of Merced.  Campus Parkway spans from California State Route 99 to Yosemite Avenue and is part of the larger conceptual Campus Loop corridor.  The Campus Loop in full scale a series of planned roadways which if built will encircle Merced with an expressway grade beltway and permit easier access to the University of California-Merced campus.  Campus Parkway was completed in three phases in 2009, 2020 and 2022. 



Part 1; the history of Campus Parkway

The purpose of Campus Parkway is to enhance access to the campus of University of California-Merced (UC-Merced).  In full scale the corridor begins at California State Route 99 Exit 185 and extends 4.5 miles northward as a four-lane expressway to Yosemite Avenue.  The Campus Parkway corridor can be seen in contrast to the rest of the larger proposed Campus Loop which also includes Atwater-Merced Expressway. 


Currently access to the UC-Merced is mostly provided by way of substandard two-lane roadways.  The concept of a Merced campus as part of the University of California system was borne during the late 1980s and early 1990s due to increased Central Valley enrollment.  The University of California Board of Regents selected Merced for the planned new campus during May 1995.  Construction of the UC-Merced campus broke ground during October 2002 and would open for classes during September 2005.  

The Draft Environmental Impact Report for Campus Parkway was submitted via the provisions of the California Environmental Quality Act (CEQA) on April 22, 2005.  The corridor was planned as spanning from California State Route 99 north to Yosemite Parkway.  The project also included an overpass of overpass the Burlington North Santa Fe Railway and California State Route 140.  Access to California State Route 140 was proposed to be facilitated via a ramp structure.   


An initial affirmative Notice of Determination regarding Campus Parkway was issued by CEQA on December 26, 2006.  Further facets of the project were approved on September 26, 2007



Phase I of Campus Parkway included construction of the interchange with California State Route 99 and the roadway to Childs Avenue in 2009.  The Phase II corridor broke ground during early 2018 and was scheduled for completion during the first quarter of 2020.  Phase II would extend from Childs Avenue north to the ramp connecting to California State Route 140.  Phase II was funded by way of Senate Bill 1 Transportation Package.  Said bill allocated $100,000,000 in funding to Phase II and Phase III of the Campus Parkway project.  

Campus Parkway Phase II construction can be seen in a southward aerial photo facing towards California State Route 140 circa December 2018.  The connecting ramp to California State Route 140 can be seen on the left.  


Phase II construction can be seen in a January 2019 photo facing northward towards California State Route 140.  


The Phase II Campus Parkway completion dedication ceremony was held on February 3, 2020. 


Phase III of the Campus Parkway project broke ground shortly after completion of Phase II.  The Phase III corridor would extend the roadway from California State Route 140 north to the planned terminus at Yosemite Avenue.  Initial projections had Phase III opening to traffic during June 2023 but was ultimately completed ahead of schedule.  The Phase III dedication ceremony celebrating the completion of Campus Parkway was held on July 8, 2022 (photo Merced County Times). 




Part 2; a drive on Campus Parkway

Northbound Campus Parkway begins at California State Route 99 Exit 185 in the city of Merced.  The exit signage notes Campus Parkway to be the preferred access way to UC Merced.  




Campus Parkway turns northward and crosses over the Burlington North Santa Fe Railway and California State Route 140 at the Merced city limit.  State Highway access is permitted to the state highway via a connecting ramp signed as "Campus Parkway Access."










Campus Parkway passes through a roundabout at Olive Avenue.  The corridor continues northward to a terminus located at another roundabout found at Yosemite Avenue.  Beyond Yosemite Avenue local signage advises traffic to follow Lake Road to UC Merced.











Comments

Anonymous said…
That roundabout on Olive is spectacular, I regularly overtake on the approach and entry.

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...