Skip to main content

Interstate 40 Knoxville, TN SmartFIX40 Construction Photos & Video

The SmartFIX40 project in Knoxville is underway and is noteworthy because the project closes Interstate 40 through downtown Knoxville for approximately 14 months. The I-40 shutdown began not that long ago on May 1st and last through June 2009. TDOT is rebuilding from the ground up I-40 from James White Parkway (Exit 388) to Hall of Fame Drive (Exit 389).

TDOT says that the 14 month total closure will save two to three years in construction time vs. traditional piecemeal methods.

During the closure, this segment of I-40 will be widened to six through lanes and four auxiliary lanes. In addition to interstate improvements, work will include the construction of nine bridges, 14 retaining walls and three noise walls. Additionally, two existing bridges will be demolished, 12 side roads will be completed and seven new ramps will be constructed.
Through traffic on I-40 heading in both the eastbound and westbound direction will be detoured onto I-640 (the northern bypass arc of Knoxville.) Local traffic into downtown will still be able to use the stretch of I-40 through the construction zone.

Joe Babyak was out in Knoxville this weekend and took some photos and video of the SmartFix40 construction zone.

All photos are taken from the Magnolia Ave. area.







Video:

Comments

Billy said…
That's good footage! It looks like pretty much anywhere along Magnolia Avenue would be good for viewing the road work during the meet.

For those of you not in the know, I am planning a road meet in Knoxville centered around SmartFix40. It will likely take place some time around October since the work will have progressed much more by then. Also, for those who want to spend more time in the Greater Knoxville area, folks may choose to view the changing leaves in the mountains. I'll come up with a firm date a couple of months in advance, so if you're interested in viewing this massive project, we;d love to see you!
Anonymous said…
looks like they are movong fast on this it will be nice after it is done.... nice job.. the youtube clip was awesome

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...