Summerlin Parkway (Nevada State Route 613)

Nevada State Route 613 is a 5.513-mile freeway corridor carried along Summerlin Parkway in the city of Las Vegas.  Summerlin Parkway originates at Interstate 11/US Route 95 and extends 5.513 miles west to Clark County Route 215.

Summerlin Parkway was initially constructed by Summerlin Homeowners Association in 1989. The parkway originated as the US Route 95 and initially only spanned west to Town Center Drive. The parkway corridor was upgraded to expressway standards by 2000 and was extended to Clark County Route 215 by 2004.
The freeway conversion of Summerlin Parkway began in 2005. In 2019 the parkway was adopted by the Nevada Department of Transportation as Nevada State Route 613. Presently work is underway to construct a freeway-to-freeway interchange between Summerlin Parkway and Clark County Route 215.




Part 1; the history of Summerlin Parkway

Summerlin Parkway was originally a project by the developers of the Summerlin Homeowners Association.  The first segment of the parkway was completed in 1989 west of US Route 95 as a divided highway to Town Center Drive.  This initial project corridor included an interchange with US Route 95.  The interchange lacked an eastbound Summerlin Parkway to northbound US Route 95 movement. 

Improvements to Summerlin Parkway during the early 1990s were funded by the Transportation Commission of Southern Nevada.  Freeway interchanges along the parkway were installed at Buffalo Drive in 1992 which was followed by Rampart Boulevard in 1994. 

Summerlin Parkway first appears on the 1993/1994 Nevada Department of Transportation map.  The map displays the parkway ending at Town Center Drive. 

The 2000/2001 Nevada Department of Transportation map displays Summerlin Parkway having a planned extension west of Town Center Drive to planned Clark County Route 215 (the Las Vegas Beltway).


The 2002/2003 Nevada Department of Transportation map displays Summerlin Parkway having been extended west of Town Center Drive as a conventional highway to Clark County Route 215.  The expressway portion of the parkway is then shown to end approaching Anasazi Drive. 

The intersection between Summerlin Parkway and Durango Drive was converted into a half interchange by 2005.  In 2006 the intersection between the parkway and Anasazi Drive was converted into an interchange.  Also, during 2006 the Nevada Department of Transportation completed the missing movement at the Summerlin Parkway/US Route 95 interchange which permitted eastbound traffic to transition northbound. 

Summerlin Parkway can be seen in detail on the 2012 United States Geological Survey map.  During 2012 High Occupancy Vehicle lanes were installed on the Summerlin Parkway/US Route 95 interchange. 

In mid-year 2016 the city of Las Vegas installed a cable median barrier along Summerlin Parkway.  The parkway previously had lacked a median barrier and was subject to head-on collisions due to crossover accidents. 





During 2017 High Occupancy Vehicle lanes were installed on Summerlin Parkway between Buffalo Drive and Durango Drive.  Auxiliary lanes were on the westbound parkway to Rampart Drive, both directions between Rampart Drive and Town Center Drive, and eastbound from Clark County Route 215 to Anasazi Drive.  

On January 1, 2019, maintenance responsibility for Summerlin Parkway was transferred from the city of Las Vegas to the Nevada Department of Transportation.  The parkway was assigned as Nevada State Route 613.  The Nevada State Route 613 designation first appears on the 2023/2024 Nevada Department of Transportation map. 


Construction of a freeway-to-freeway interchange between Summerlin Parkway and Clark County Route 215 broke ground during late 2024.  This interchange is still under construction as of the publishing date of this blog. 





Part 2; a drive on Summerlin Parkway

Westbound Summerlin Parkway branches from Interstate 11/US Route 95 northbound at Exit 81A.  The interchange gantries currently make no references to Nevada State Route 613. 





The first westbound exit on Summerlin Parkway is at Buffalo Drive. 


Nevada State Route 613 shields can be found on most of the surface interchanges with Summerlin Parkway.  This shield was observed on southbound Buffalo Drive along the ramp to westbound Summerlin Parkway.  


Westbound Summerlin Parkway next intersects Durango Drive. 


The first exit number on westbound Summerlin Parkway can be found approaching Rampart Drive (Exit 3). 


Westbound Summerlin Parkway Exit 1 intersects Town Center Drive. 




Westbound Summerlin Parkway Exit 0 intersects Anasazi Drive.  A Nevada State Route 613 shield can be observed approaching this exit. 





The freeway segment of Summerlin Parkway ends, and the corridor continues to a terminus at Clark County Route 215.






Part 3; Roadwaywiz on Summerlin Parkway

Gribblenation admin Dan Murphy featured behind the wheel drives his Roadwaywiz YouTube channel in 2020.



Comments

Popular posts from this blog

West Canyon Road (Snow Canyon State Park)

West Canyon Road is an approximately four-mile dirt service road located in Snow Canyon State Park.  West Canyon Road follows Snow Canyon from the Whiptail Trail to the northern State Park boundary and intersects numerous trailheads.   West Canyon Road was the original main road through Snow Canyon after it was designated as a Utah State Park in 1957 and opened to the public in 1962. Part 1; the history of West Canyon Road Snow Canyon is located in the Red Mountains north of the city of Ivins in Washington County, Utah.  Snow Canyon is one of many sandstone canyons located in the Red Mountains.  Part of the extinct Santa Clara Volcano punctured the Red Mountains via lava tubes. From approximately the year 200 to 1,250 the area around Snow Canyon was inhabited by the Ancestral Puebloans.  Mormon pioneers established Santa Clara south of Snow Canyon in 1854.  Local legend has it that the settlers discovered Snow Canyon in the 1850s while searching for m...

Indian Gulch Extension and the Indian Gulch ghost town site

Indian Gulch Extension is an approximately 6-mile-long rural highway corridor in the Sierra Nevada foothills of western Mariposa County.  Indian Gulch Extension begins at Indian Gulch Road near the namesake ghost town of Indian Gulch.  From the ghost town site Indian Gulch Extension extends southwesterly to the Merced County line where it becomes Waltz Road.   The former Gold Rush era community of Indian Gulch which was settled near Santa Cruz Mountain in 1849 and had standing structures until the early 1970s.  What is now Indian Gulch Extension was approved for construction by the Mariposa County Commissioners in 1862.  The purpose of the corridor was to provide Indian Gulch with a direct connection westward with the greater Stockton-Los Angeles Road.  The Stockton-Los Angeles Road would go onto define much of the Mariposa County and Merced County line.  Part 1; the history of Indian Gulch and Indian Gulch Extension Indian Gulch Road is named aft...

The reemergence of US Route 99 at the Ventura Freeway/Golden State Freeway interchange

During April 2023 a portion of the sign gantry on the eastbound Ventura Freeway (California State Route 134) approaching the Golden State Freeway (Interstate 5) fell.  The fallen portion of the sign gantry revealed a once covered US Route 99 shield.  The uncovered US Route 99 sign (blog cover courtesy Ian Ligget) is a 1956-63 era freeway specification US Route shield.  This blog will explore in brief how the Golden State Freeway was developed as US Route 99 and US Route 6 before becoming solely Interstate 5.   This blog is part of the larger Gribblenation US Route 99 Page.  For more information pertaining to the other various segments of US Route 99 and it's three-digit child routes check out the link the below. Gribblenation US Route 99 Page Part 1; visiting the US Route 99 shield at the Ventura Freeway/Golden State Freeway Interchange As noted in the introduction the US Route 99 shield can be seen on the eastbound Ventura Freeway (California Sta...