In 1971 New Don Pedro Dam was completed which raised the level of the Don Pedro Reservoir. Near Bonds Flat within southern Tuolumne County the expanding reservoir required California State Route 132 to be relocated uphill. During periods of low water in the reservoir the original alignment of California State Route 132 can be seen at Postmile TUO R5.265. This blog will explore the history of California State Route 132 in the Bonds Flat area and the ruins that can be found in the Don Pedro Reservoir.
The history of California State Route 132 at the Don Pedro Reservoir
O
What was to become California State Route 132 was added the state highway system by 1933 Legislative Chapter 767 as Legislative Route Number 110. The original definition of Legislative Route Number 110 carried to from the "Fresno-Tracy Westside Highway to the Sonora-Mariposa Road via Modesto." The entire corridor of Legislative Route Number 110 was assigned as California State Route 132 when the original run of Sign States Routes was announced in the August 1934 California Highways & Public Works.
East of Bonds Flat within Tuolumne County the alignment of California State Route 132 crossed Roger Creek near the southern extent of the Don Pedro Reservoir. The Don Pedro Reservoir had become functional in 1924 upon completion of the original Don Pedro Dam. The original Don Pedro Dam is a concrete structure which is 283 feet high.
The original Don Pedro Dam can be seen in a 1925 era public domain photo.
The original alignment of California State Route 132 east of Bonds Flat can be seen in detail on the 1944 United States Geological Survey map.
In 1961 bonds were issued to expand the existing Don Pedro Reservoir. The expansion required a new dam to be constructed downstream from the existing arch concrete structures. After delays construction of the New Don Pedro Dam would commence with the spillways on August 29, 1967. The new dam was an embankment design which topped out on May 28, 1970. Old Don Pedro Dam was covered by rising waters on April 12, 1970.
New Don Pedro Dam would be completed and dedicated in 1971. The structure is 585 feet high and has length of 1,900 feet. The raised reservoir required the relocation of California State Route 132 uphill from the new southern extent of the reservoir. During period of low water level, the original alignment of California State Route 132 can be seen at Postmile TUO R5.265.