Atwater-Merced Expressway


Atwater-Merced Expressway is a mostly unconstructed new highway located in Merced County.  The planned scope of the expressway would connect from California State Route 140 south of Atwater to California State Route 59 near the University of California-Merced Campus.  Phase 1A was completed during 2016 and included a new ramp at California State Route 99 along with a new segment of highway to Green Sands Road.  Currently Phase 1B to Santa Fe Drive (County Route J7) is planned to break ground during late 2026 or early 2027.  



Part 1; an overview the planned scope of Atwater-Merced Expressway

The purpose of the Atwater-Merced Expressway is to enhance access to the campus of University of California-Merced (UC-Merced).  In full scale the corridor is planned to originate at California State Route 140 (McSwain Road) south of Atwater and terminate at the intersection of California State Route 59 and Bellevue Road.  

Currently access to the UC-Merced is mostly provided by way of substandard two-lane roadways.  The concept of a Merced campus as part of the University of California system was borne during the late 1980s and early 1990s due to increased Central Valley enrollment.  The University of California Board of Regents selected Merced for the planned new campus during May 1995.  Construction of the UC-Merced campus broke ground during October 2002 and would open for classes during September 2005.  

Phase 1A of Atwater-Merced Expressway included a replacement for the Buhach Road ramp at California State Route 99 and new segment of road connecting north to Green Sands Avenue.  $47 million of the phase was funded by way of 2006 Proposition 1B.  The remaining unfunded part of the phase fell through due to a state-wide budget cut which came during the 2007-2009 era.  

The remaining balance of Phase 1A funding came later via various differing state sources and broke ground during 2013.   The phase was dedicated by the Merced County Association of Governments and Caltrans on March 25, 2016.  



Phase 2 and 3 of the Atwater-Merced Expressway remain not fully funded.  Phase 1B would extend the corridor from Green Sands Road north to County Route J7 (Santa Fe Drive).  Phase 2 is planned to connect to California State Route 59/Bellevue Road whereas Phase 3 would extend south to California State Route 140 (McSwain Road).  



Atwater-Merced Expressway 1B is currently facing Environmental Impact Study difficulties.  The Merced Sun-Star reported during April 2025 that Merced County officials hope to break ground on the segment during late 2026 or early 2027.  



Part 2; a drive on Atwater-Merced Expressway

The completed Phase 1A portion of Atwater-Merced Expressway is accessible from California State Route Exit 193.  The corridor currently only extends north of the freeway as a two-lane highway a short distance to a temporary terminus at Green Sands Roads.  






Comments

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...