Skip to main content

Former US Route 101 on Alta Street in Gonzales

Gonzales is a city located in Salinas Valley of Monterey County, California.  Modern US Route 101 is aligned around Gonzales via a freeway bypass which swings east of downtown.  The original alignment of US Route 101 in Gozales was aligned directly through the community on Alta Street.  Above the cover photo of this blog is a view on former US Route 101 in Gonzales on Alta Street.  Below Gonzales can be seen along US Route 101 on the 1935 Division of Highways Map of Monterey County.  


Part 1; the history of US Route 101 in Gonzales

The lands now occupied by the city of Gonzales was once part of Rancho Rincon de la Puente del Monte.  Rancho Rincon de la Puente del Monte was granted to Teodoro Gonzales in 1836 who was then serving as the Alcalde of Monterey.  Following the Mexican American War, the Mexican Land Grants were honored by the American government.  Ownership of Rancho Rincon de la Puente del Monte thusly remained in the hands of the Gonzales family. 

During 1872 Dr. Mariano Gonzales and his brother Alfredo Gonzales granted an easement through their lands to the Southern Pacific Railroad.  In 1874 the Gonzales brother would plot a town site along the Southern Pacific Railroad which they named after their family.  Gonzales can be seen on the Southern Pacific Railroad on the 1882 Bancroft's Map of California and Nevada.  

Salinas Valley was ultimately part of the American El Camino Real which began being signed as an Auto Trail starting in 1906.  The era of State Highway Maintenance through Salinas Valley would ultimately begin with the 1909 First State Highway Bond Act which was approved by voters in 1910.  One of the highways approved through the 1909 First State Highway Bond Act was a 481.8-mile highway originating at the City Limits of San Francisco which terminated in San Diego.  This highway would ultimately come to be known in time as Legislative Route Number 2 ("LRN 2").  Within Salinas Valley much of LRN 2 would follow the existing corridor along the frontage roads of the Southern Pacific Railroad which included the community of Gonzales.  

Gonzales can be seen on the 1917 California State Automobile Association Map along LRN 2 via Alta Street.  


The 1920 Rand McNally Highway Map of California shows El Camino Real and the Pacific Highway following LRN 2 through Gonzales.  



The 1924 Rand McNally Map of California shows the California Banff Bee-Line Highway co-signed with the Pacific Highway through Gonzales. 



The initial draft of the US Route System was approved by the Secretary of Agriculture during November of 1925.  The US Route System within California was approved by California Highway Commission with no changes recommended by January 1926.  The initial alignment of US Route 101 ("US 101") was planned to follow LRN 2 from San Francisco to San Diego via Salinas Valley.  US 101 is shown on a map published in the 1926 California Highways & Public Works following LRN 2 south from San Francisco towards San Diego.
 


During November of 1926 the US Route System was approved by the ASSHO.  US Route 101 can be seen aligned through Gonzales on the 1926 Rand McNally Junior Map of California.  

The March 1933 California Highways & Public Works announced reconstruction of US Route 101/LRN 2 from Chualar to Camphora by way of Gonzales was underway.  The existing highway is stated to be too narrow and breaking apart too quickly.  

The 1935 Division of Highways Map of Monterey County displays US Route 101/LRN 2 aligned through Gonzales along Alta Street. 


The March 1937 California Highways & Public Works features an article regarding a new edge cutting surfacing device which was first tested when US Route 101/LRN 2 was repaved between Soledad-Gonzales during 1936.  


Gonzales would incorporate as a city on January 14, 1947.  The May/June 1950 California Highways & Public Works announced an awarded contract to repave US Route 101/LRN 2 between Gonzales and Chualar.



The November/December 1953 California Highways & Public Works announced a contract to grade and pave US Route 101/LRN 2 from Chualar south to Gonzales.  


The July/August 1954 California Highways & Public Works announced US Route 101/LRN 2 had been expanded to expressway standards from Chualar south to Gonzales.  

The November/December 1957 California Highways & Public Works US Route 101/LRN 2 between Soledad and Gonzales was budgeted to be converted to four lane expressway standards.



The July/August 1958 California Highways & Public Works announced the completion of the US Route 101/LRN 2 freeway through Chualar.  The Chualar Freeway corridor is stated to have broken ground during April 1957 and took approximately a year to complete.  The former corridor of US Route 101 on Grant Street is stated to have been converted to a frontage road of the new Chualar Freeway.  The Chualar Freeway corridor is stated to terminate two miles north of Gonzales.  The article stub notes design plans were underway to build US Route 101/LRN 2 to a freeway east of downtown Gonzales. 










The September/October 1958 California Highways & Public Works noted the contractor responsible for converting US Route 101/LRN 2 to expressway standards in the Gonzales-Soledad corridor was given 275 days to complete the project.  Part of the expressway conversion between Gonzales-Soledad was construction of an interchanges at Camphora-Gloria Road and Soledad Medium Security State Prison. 


The September/October 1959 California Highways & Public Works notes the conversion of US Route 101/LRN 2 to four lane expressway standards between Soledad-Gonzales was expected to be complete by November.  


The November/December 1960 California Highways & Public Works notes the US Route 101/LRN 2 freeway bypass of Soledad had opened earlier in the year.  The article stub references the planned freeway bypass of Gonzales as being budgeted.  


The November/December 1961 California Highways & Public Works notes the US Route 101/LRN 2 freeway bypass of Greenfield was complete and construction of the freeway bypass of Gonzales was underway.  


The November/December 1963 California Highways & Public Works notes the US Route 101/LRN 2 freeway bypass of Gonzales opened during the previous July.  



Since the completion of the freeway grade during 1963 there has been no major alterations to US Route 101 in Gonzales.  The Legislative Route Numbers were dropped as part of the 1964 State Highway Renumbering which left US Route 101 as the legislative designation through Gonzales. 



Part 2; a drive on former US Route 101 in Gonzales on Alta Street

From modern US Route 101 northbound traffic can access the older alignment on Alta Street via Exit 310.  




Northbound Alta Street enters downtown Gonzales.  









From downtown Gonzales, Alta Street continues northbound and loops back to the modern freeway alignment of US Route 101. 







Comments

Popular posts from this blog

Did Caltrans just kill the G26 cutout US Route shields?

The US Route System was formally created by the American Association of State Highway Officials during November 1926.  Through the history of the system the only state to which has elected to maintain cutout US Route shields has been California.  The G26 series cutout US Route shields have become a favorite in the road enthusiast hobby and are generally considered to be much more visually pleasing than the standard Federal Highway Administration variant.  However, the G26 shield series appears to have been killed off on January 18, 2026, when Caltrans updated their Manual of Uniform Traffic Control Devices.  This blog will examine the history of the US Route shield specifications in California and what is happening with the 2026 changes.  The blog cover photo is facing towards the terminus of California State Route 136 and at a G26-2 specification US Route 395 shield.  In the background Mount Whitney can be seen in the Sierra Nevada range.   ...

May 2023 Ontario Trip (Part 3 of 3)

  Over the years, I have made plenty of trips to Ontario, crisscrossing the southern, central and eastern parts of the province. Living in Upstate New York, it's pretty easy to visit our neighbor to the north, or is that our neighbor to the west? Ottawa is one of my favorite cities to visit anywhere in the world, plus I've discovered the charm of Kingston, the waterfalls of Hamilton (which is on the same Niagara Escarpment that brings us Niagara Falls), the sheer beauty of the Bruce Peninsula, and more. But I hadn't explored much of Cottage Country. So I decided to change that, and what better time to go than over Memorial Day weekend, when the daylight is long and I have an extra day to explore. On the third and final day of my trip, I started in Huntsville and made my way through Muskoka District and Haliburton County, passing by many lakes along the way. I stopped in towns such as Dorset, Haliburton and Bancroft before making a beeline down to Belleville and then over th...

Ghost Town Tuesday; Nichols, FL

A couple years ago I spent a lot of spare time exploring phosphate mining ghost towns in the Bone Valley of Polk County, Florida.  One ghost town in particular called Nichols on Polk County Route 676 west of Mulberry caught my eye due to a relative lack of documentation on ghosttowns.com. Nichols was created in 1905 during the early phosphate mining boom in the Bone Valley region.  For the time Nichols was unusual since it had company housing in the Nichols Mine site and private residences outside the gate.  Nichols is only about two miles west of Mulberry which probably made it a somewhat reasonable commute even by the wonky standards of the early 20th Century.  Most of the Bone Valley region was relatively remote which made commuting or homesteading impractical which is why there are so many ghost towns in the area.  The company housing section of Nichols was phased out and abandoned by 1950. The Nichols town site is largely abandoned and could "possibl...