Skip to main content

Could a Diverging Diamond Interchange be coming to Southeastern North Carolina?

It's not every day that a driver gets to legally drive on the "wrong side of the road".  But if a recent NCDOT proposal for the US 74/76 interchange with NC 133 in Leland is approved, Brunswick County motorists will be able to do just that.

The DOT is considering building a "Diverging Diamond Interchange", also known as a DDI, as a replacement of the current and heavily congested diamond interchange when the US 74/76 causeway is widened in 2013.  The DDI is one of a few possible plans for the interchange when the $19 million project begins.

A diverging diamond is unique as the travel lanes on the surface road- in this case NC 133 - are flipped to the opposite side before and after the interchange.  This flip is controlled by a traffic light at each end.  Traffic to and from the interchange ramps also intersect at the signals. 

The result is left turns onto and off of the interchange ramps now go unimpeded - that is the driver does not have to worry about crossing traffic in the opposite direction when making the turn.  Also, the only traffic signals needed are the two at the location of the 'flips'.

In 2009, Missouri was the first state to install the 'diverging diamond'at MO 13 and Interstate 44 in Springfield.  A photo of the completed project is below. (Source: Missouri Department of Transportation)

Missouri installed this interchange as it saved nearly $4 million compared to building a higher powered traditional diamond with additional turning lanes.  With NCDOT putting together every possible penny that they can find, the DDI will be a very high possibility.  Missouri also boasts a lower accident rate at the MO 13/I-44 interchange, a reduction of 50 percent.

In addition to cost advantages, the DDI allows for interchanges to remain below capacity longer.  They are maximized if there is a high volume of left turns on a lower speed surface road with space limitations. 

There are drawbacks, however.  On the surface route, both sets of signals cannot be green at the same time for both directions.  The flow of traffic will be more controlled and through traffic - in this case on NC 133 - will have to come to at least one stop when going through the interchange.  And of course the obvious concern - motorists who would be confused and unfamiliar with the new traffic pattern.

Since construction of the diverging diamond in Springfield in 2009, a handful of DDI's have been constructed throughout the country.  If this DDI is built in Leland, it will be North Carolina's second constructed DDI.  The first, located on I-77 at Exit 28 in Mecklenburg County, is scheduled to open in 2012.

Story Link:
New interchange design considered on NC 133 in Leland ---Wilmington Star-News

(HT: Joe Babyak)

Comments

James Dunlop said…
The one in Leland would be anywhere between the first and seventh DDI in the state. The Cornelius one looks like it'll be sometime in 2013 instead of 2012, and there's three projects in Concord, two on 85 and one on the last new section of 485. These three are actually let to contract, although the Design-Build schedule puts them in late 2013/early 2014.

Another one in Kernersville on I-40 and one in Lumberton on I-95 are being worked on, however their schedule will most likely be behind the others. Right now, any one of these could be the first one completed. I'm betting on the two on I-85 in Concord, based on the construction schedules I've seen. Cornelius could slip in ahead of those, though.

Jim Dunlop
Anonymous said…
MODOT just opened another DDI, I-270 at Dorsett Rd, in St. Louis County, last week.
hotrod6147 said…
Was the new bridge at Old Kingsdale Road completed? Was this simply a bridge, or an interchange?

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...