Skip to main content

Latest Greensboro Loop Visit

I spent a week on vacation in Kentucky (will provide details in a later post). On my way last Saturday (9/12), I decided to check whether NCDOT had followed up on its pledge in its 8/20 news release to complete the I-40 move related re-signing in 'about 3 weeks'. Well, they're close, but no cigar as of yet. The first change noticed is that they finally filled out the first signs for the Loop heading west on I-85South/I-40 West:
They've added the predicted I-73 shields below what was a blank under 'To North.' Why that had to wait until now, when I-73 was signed on the Loop a few months back, only NCDOT knows. This is the farthest reference to I-73 being about 12 miles from the route itself.
The signage at the split, from looking into the distance, the last old I-85 Business exit numbers have been removed for the next exit on I-40. Notice the promised painted shields on the highway denoting which lanes are I-85's and which are I-40's have yet to make an appearance.

All the small green signs noting the route numbers along the Loop have finally been changed:
This makes the I-85 signs heading south before US 421 seem a bit too big. While the rest:
Simply required moving the I-85 shield and direction to the left hand of the sign.

If some people complain that NCDOT sometimes doesn't put up enough signs for following a route accurately, you cannot say that with US 421 North:
First, they subtly changed the exit sign to make US 421 South to Sanford the primary information. Second, if you couldn't tell where was US 421 North was they added signs prior to the former US 421 North exit:
And, if that was not enough...
They added another sign past the former North exit to tell you to stay on I-85.

As far as the changes to the I-73 portion are concerned. They finally changed the left-hand sign before Wendover Ave. heading southbound that had the last reference to I-40 (no photo). They previously had updated the smaller green signs removing the I-40 references:
And changed all the exit numbers. There was still one sign, however, not completely changed:
This is the first sign for what should be I-40 and North US 421, the latter hasn't made it up there yet. The remainder of the signage northbound is correct:
I imagine the blank space to the right on this overhead sign will in the future have the East 40 sign and a reference to I-73 and I-840 will occupy the middle.

Finally, while I've already shown the signs at the split:
This photo shows it from the perspective of heading onto I-40 instead of continuing on I-73. Notice again no painted shields, nor were there any, as far as I could tell, heading the other way on I-40 before the eastbound split. All of this guarantees, unless someone else wants to do the job, another trip to Greensboro for yours truly to get additional photos.

Comments

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...