Skip to main content

After decades of frustration...PA 51 and PA 88 intersection finally to be redesigned

For decades, residents and commuters in Pittsburgh's South Hills have waited for drastic and much needed improvements at the intersections of PA 51 and 88 in the city's Overbrook neighborhood.  From failed expressway plans and intersection redesign plans, this was one bottleneck that many thought would never go away.

Well, by 2014, the notorious left lane back up on Northbound PA 51 with traffic wanting to turn onto Library Road (PA 88) , Glenbury St.,and buses wanting to access the South Busway will be no more.  The daily mess will be replaced by a two-lane jughandle which will run from near Fairhaven Road, behind the existing Rite Aid Pharmacy, and then utilize Ivyglen St. 

The jughandle will be the key feature to a project that will eliminate all left turns from PA 51 at the dangerous intersection.

Other improvements include a second jughandleon PA 51 South at Fairhaven Road.  This jughandle will also utilize Stewart Ave.  In addition, three structurally deficient bridges and two culverts will be rebuilt.  A third, new culvert will be built over Weyman Run along the northbound jughandle route.

The project will cost between $14 and 15 million.  Construction will begin in 2013 and finish the following year.  A few businesses, including the Hillview Tavern, will be lost in right-of-way acquisition.

Story Links:
PennDOT to unveil planes for Routes 51, 88 in Overbrook ---Pittsburgh Post-Gazette
PennDot: 'Jug Handle Will Alleviate Route 88-51 Bottleneck ---WTAE-TV

Commentary:
In the P-G article, it leads with a line from a Joe Grata story in 1993, "The public will get its first detailed look today at plans to untangle the intersection of Routes 51 and 88 in Overbrook."  I remember that story, and a few others and prior to and after it on other plans and delays to revamp this intersection.  I recall a billboard being a problem in a right-of-way squabble.

The WTAE story mentioned how this isn't the ultimate solution but the most cost-effective, and it most likely is.  With any chance to build a urban expressway along the Saw Mill Run valley killed decades ago, the only way to improve any traffic flow patterns on PA 51 is do piecemeal minor improvements.  Over 10 years ago, the much needed Liberty Tunnels, West Liberty Avenue, and PA 51 interchange was built.  Later, improvements were made to the intersection of PA 51 and Woodruff Ave.  Now, the much needed improvements to the 51 and 88 intersection. 

Now only if the state would come up with the money to buy all of the blighted Levitske Brothers property along Saw Mill Run Blvd. and use that to widen Route 51.

Comments

Anonymous said…
The comment about the Levitskie Brothers signs is priceless!

Popular posts from this blog

Crescent City Connection (New Orleans, LA)

The Crescent City Connection is a massive dual-span steel truss bridge that spans the lower Mississippi River at downtown New Orleans, about 95 river miles upstream from the mouth of the great river at the Head of Passes Light. If counted as a single bi-directional highway bridge, the parallel spans combine to form the single busiest bridge on the Mississippi River and its importance as a linchpin in the region’s transportation network cannot be overstated. While there have been various schemes over the years to construct bridges downriver from Algiers Point, this bridge has been the southernmost bridge on the Mississippi River since its initial construction in the 1950s. The years immediately following the end of World War II were a transformational period in the history of New Orleans. Already one of the great economic and cultural centers of the American Deep South, it was recognized at this time that major changes and improvements to the city’s transportation infrastructure would b

Caliente-Bodfish Road

Caliente-Bodish Road is one of the finest driving roads in the southern Sierra Nevada range and has rich history. The approximately thirty-two-mile-long highway connects from Kern River Road in Bodfish south to Bena Road (former US Route 466) via Caliente siding. Caliente-Bodfish Road is a segment of Thomas Baker's stage road which facilitated overland travel to the claims of the Kern River Gold Rush. The Baker Stage Road was constructed during the 1860s-1870s and spanned from the outskirts of Caliente north to the Stockton-Los Angeles Road near Tailholt in Tulare County. The blog cover photo is from the nine-mile segment north of Caliente Creek Road which is known as the "Lion's Trail." Caliente-Bodish Road carries the internal designation of Kern County Road 483. Part 1; the history of Caliente-Bodfish Road Caliente-Bodish Road is a segment of what was Thomas Baker's stage road to Kern River Valley.  The Kern River Gold Rush began in 1853 and spurred devel

The Dummy Lights of New York

  A relic of the early days of motoring, dummy lights were traffic lights  that  were  placed  in the middle of a street intersection. In those early days, traffic shuffled through busy intersections with the help of a police officer who stood on top of a pedestal. As technology improved and electric traffic signals became commonplace, they were also  originally  positioned on a platform at the center of the intersection. Those traffic signals became known as  " dummy lights "  and were common until  traffic lights were moved  onto wires and poles that crossed above the intersection.  In New York State, only a handful of these dummy lights exist. The dummy lights  are found  in the Hudson Valley towns of Beacon and Croton-on-Hudson, plus there is an ongoing tug of war in Canajoharie in the Mohawk Valley, where their dummy light has been knocked down and replaced a few times. The dummy light in Canajoharie is currently out of commission, but popular demand has caused the dummy