Skip to main content

Tour of the Triangle Expressway

On Saturday, December 10th, I took a drive to check out the newly opened NC 147 Extension and what will become on Janurary 3rd - the state's first toll road.

Of course, the entire photoset from the trip is on flickr.

066

Right before Thanksgiving, a number of us got a sneak peak at the new highway during the Expressway Trot, a 5k that went from Hopson Road to Interstate 40 and back.  Obviously, this time I was driving on it, and not running.  So let's take a look at some of the signs approaching NC 147 from I-40 and NC 147 itself.

The VMS's on I-40 in both directions announced the new highway's opening.

006

The overheads on I-40 at I-540 have been updated for the eventual extension of the Triangle Expressway and NC 540.  Some of the signs are quite gigantic.

007

The signs at NC 147 have been updated as well.  Any of the signs for the entrance to the toll road read: "NC Quick Pass" or "Bill by Mail".  Note the Exit 278 sign.  It should read "NC 55 / TO NC 54"

012

The Exit Gore on I-40 for NC 147 South read "TOLL EXIT" which I had not seen before, but I am guessing is MUTCD standard.

017

And here we are on NC 147 South TOLL.

023

This overhead is quite the size.  It's for the directional Y interchange where NC 147 meets NC 540.  Note a few things on the sign.  One NC 540 changes from East/West here (I-540 is also signed as East/West) to North/South. Also, there's space for when NC 540 becomes Toll and eventually for TO US 1 South and possibly US 64.

028

When you get to Exit 1 - you will notice ghost ramps stubs for a four lane highway.  This will one day head to Cary and meet the McKrimmon Parkway.

033

Now we're headed North on NC 540 approaching the new Exit 67 for NC 147 and the Triangle Expressway.

042

Exit 67 had previously led to Davis Drive at Kit Creek Road.  Now, Exit 67 is a high powered, free-flowing, fast moving, expressway to expressway interchange. (If I said freeway, it would be misleading since both roads will soon be tolled.)

Speaking of tolling, here's what the all electronic toll booths look like.  This is where NC 540 will transition from free to toll and vice versa.  These toll booths will remain inactive to later in 2012 when the TriEx and NC 540 is extended southwards towards Apex and eventually Holly Springs.

046

Now I am on NC 540 West/South approaching NC 147.

052

There wasn't a lot of traffic this Saturday afternoon.  It was about 12:30 when I took this photo.  It'll be interesting to see if this is what the highway will look like once the tolls begin on January 3rd.

057

An interesting oddity on NC 147, the Davis Drive/Hopson Road Interchange has a different exit number in each direction.  Southbound it is Exit 3 - and Hopson Road is the first access point.  Northbound is Exit 2 with Davis Drive it's first access point.  Here is the Exit 2 off ramp at Hopson Road.  Davis Drive traffic wanting to reach NC 147 North would also see this sign.

060

Here is an example of what the toll schedule signs look like.

064

Here's an example of the milemarkers that will be on the Triangle Expressway.  Really nothing different than what is already used.

068

One of the nicer signs on the highway is this guide sign 'END TOLL 147'/'BEGIN NC 147' combination located where NC 147 meets I-40 (Exit 5).

069

Finally, when driving for the second time down NC 147 Toll, I took a quick glimpse at where NC 147 had jogged southwest towards TW Alexander Drive.

078

I had noticed the back of the old I-40 Exits 5A-B guide sign that stood at the then beginning of NC 147.  The shot is zoomed in as the old road is fenced off.  NC 147 had ended at a stoplight at TW Alexander, which is now removed.  Here is what it looks like today.

080

I am sure it will be a matter of time until the guide sign and pavement is removed.

Overall, I like the new road.  The signs are pretty sharp and have some new changes that we're not used to seeing here in North Carolina.  I'm looking forward to seeing the NC 540 extension when it opens later in 2012.



Comments

Charlie said…
Not that I'm planning to be anywhere near the Triangle in the near future, but is NC Quick Pass E-ZPass compatible? I know Florida's SunPass isn't, but Virginia uses E-ZPass.
Bob Malme said…
Glad they kept 'my' exit numbers on 540. Too bad they didn't go with purple signs like the first maps hinted at. With all the 'toll' signage they put up, I'm surprised a small yellow banner didn't find its way on top of the mileposts.
As for compatibility with E-ZPass, not yet. The NC legislature has to pass privacy protection laws for motorists using the transponders that is identical to those in all other E-ZPass states first.
Laura said…
On Thursday at 4:30 p.m., there was the same amount of traffic that you saw on Saturday. Will definitely be interesting to see what it looks like with the toll. If it looks like that all the time, I'll happily pay cash$money to use it to bypass all the traffic on 40 from NC 147 to 540. :-)

BTW, nice writeup and good pictures!
Brian said…
If there's only controlled access through interchanges, it isn't misleading at all to call the TriEx a freeway, as that's how that word is defined (not whether the road carries tolls).

Popular posts from this blog

Did Caltrans just kill the G26 cutout US Route shields?

The US Route System was formally created by the American Association of State Highway Officials during November 1926.  Through the history of the system the only state to which has elected to maintain cutout US Route shields has been California.  The G26 series cutout US Route shields have become a favorite in the road enthusiast hobby and are generally considered to be much more visually pleasing than the standard Federal Highway Administration variant.  However, the G26 shield series appears to have been killed off on January 18, 2026, when Caltrans updated their Manual of Uniform Traffic Control Devices.  This blog will examine the history of the US Route shield specifications in California and what is happening with the 2026 changes.  The blog cover photo is facing towards the terminus of California State Route 136 and at a G26-2 specification US Route 395 shield.  In the background Mount Whitney can be seen in the Sierra Nevada range.   ...

May 2023 Ontario Trip (Part 3 of 3)

  Over the years, I have made plenty of trips to Ontario, crisscrossing the southern, central and eastern parts of the province. Living in Upstate New York, it's pretty easy to visit our neighbor to the north, or is that our neighbor to the west? Ottawa is one of my favorite cities to visit anywhere in the world, plus I've discovered the charm of Kingston, the waterfalls of Hamilton (which is on the same Niagara Escarpment that brings us Niagara Falls), the sheer beauty of the Bruce Peninsula, and more. But I hadn't explored much of Cottage Country. So I decided to change that, and what better time to go than over Memorial Day weekend, when the daylight is long and I have an extra day to explore. On the third and final day of my trip, I started in Huntsville and made my way through Muskoka District and Haliburton County, passing by many lakes along the way. I stopped in towns such as Dorset, Haliburton and Bancroft before making a beeline down to Belleville and then over th...

Ghost Town Tuesday; Nichols, FL

A couple years ago I spent a lot of spare time exploring phosphate mining ghost towns in the Bone Valley of Polk County, Florida.  One ghost town in particular called Nichols on Polk County Route 676 west of Mulberry caught my eye due to a relative lack of documentation on ghosttowns.com. Nichols was created in 1905 during the early phosphate mining boom in the Bone Valley region.  For the time Nichols was unusual since it had company housing in the Nichols Mine site and private residences outside the gate.  Nichols is only about two miles west of Mulberry which probably made it a somewhat reasonable commute even by the wonky standards of the early 20th Century.  Most of the Bone Valley region was relatively remote which made commuting or homesteading impractical which is why there are so many ghost towns in the area.  The company housing section of Nichols was phased out and abandoned by 1950. The Nichols town site is largely abandoned and could "possibl...