Skip to main content

NCDOT Releases Construction Project Rankings

From an WRAL.com story tonight: http://www.wral.com/traffic/story/7087906/

NCDOT, ahead of its public meetings on Monday, has released its rankings of state highway projects, both statewide, and by division, for two different categories: highway and non-highway and for highways using three different components: Safety, Mobility, and (Infrastructure) Health, and three tiers: Statewide, Regional, and Subregional. These in turn are broken down into many 'sub-modes' such as pavement rehabilitation, highway construction, etc. At this time all projects are listed even if they are not ultimately going to be paid for by the state and included in the state TIP. The document is available in the link above, and here:
http://www.ncdot.org/performance/reform/documents/

The new rankings are part of a process to remove politics from determining what highway projects are chosen. The highest ranked project according to Mobility is the paving of Secretary of Transportation Gene Conti's driveway (just kidding). Actually, the highest ranked mobility project regionally is: the widening of NC 54 in Durham from I-40 to NC 55. While Statewide its widening I-85 in Davidson County. For Safety the top ranked score Regionally is the upgrading of NC 65 from Germantown to the Virginia state line in Stokes County. Statewide the top safety project is upgrading NC 107 in Jackson County. For Infrastructure Health regionally its replacing a bridge, but not the bridge you're probably thinking of. This is the US 17 Business bridge over the Perquimans River in Perquimans County. Statewide its the widening and modernizing of NC 11 in Duplin and Lenoir County.

Breaking it down by Division, particularly Division 5 which includes Wake and Durham Counties the top regional project is, as stated before, the widening of NC 54. The repaving of I-440 also gets top ranking in the pavement subcategory. The top state highway project is the widening of US 1/64 from 6 to 8 lanes from I-40 to Lake Wheeler Road (while removing the existing concrete layer, apparently another pavement problem has cropped up?). The 'high priority' East End Connector project in Durham is not even listed, yet alone ranked. This may mean it has just been pushed back to after FY 2012 (July 2011) when this system (only listing projects that can be completed within 5 years or by 2016) is supposed to start.

Since the document is long (452 pages) I, for now, concentrated on I-73/74 projects. At the division level most are ranked high, not a similar case for all projects though at the state level. The upgrading of US 74 east of NC 41 to west of Whiteville is given a ranking of 8 in Division 6, however it's No. 200 statewide. In Division 7 and 8 the upgrading of I-73 and I-73/74 to interstate standards is ranked 3rd under infrastructure health in the modernization sub-mode. The Number 1 statewide mobility highway project in Division 7 is to reconstruct the I-74/US 311 interchange with NC 68 in High Point. Number 2 is to build the connector for I-73 between NC 68 and Bryan Blvd. by the airport interchange (3rd statewide). Number 7 is the connector between I-73 and the W-S Beltway (I-74). In Division 8 the number 2 Infrastructure project in the Highway Misc. category is to upgrade signage along I-73 from Ellerbe to Asheboro to interstate standards (this is ranked 3rd at the state level). Upgrading US 220 through Asheboro, scheduled to start this year is ranked number 2 in statewide modernization projects for Division 8, but 218th statewide. Number 3 is the long put-off shoulder widening project from Steeds to Emery. Upgrading US 52 north of Winston-Salem to Interstate standards is ranked No. 2 for Modernization in Division 9. The upgrading of US 74 between Laurinburg and Rockingham is only ranked 139th statewide. The US 74 Rockingham Bypass is 128th.

Comment: Since the document is long, and ranks many projects using different guidelines, then breaking them down into categories, then subcategories, etc., though probably necessary to determine a project rank, it is going to make it more difficult for the general public to understand what a ranking means. Feel free to browse the document on your own and see how your favorite project is ranked and whether you think its number is accurate.

Comments

John said…
The ranking system is very complicated, so much so that even the people I work with don't understand how certain projects were ranked where they were on the list. Is that deliberate so they can "hide" the political influence, or is it necessary? Again, not even my coworkers know; the specific criteria that create the rankings have not been released even to our office.
Fantastic post, project ranking is very important for contractors and your post is very beneficial for readers.

Popular posts from this blog

The case to move Interstate 73 in Southern Ohio onto US 33

Every decade or so, Ohio pushes to revisit the proposed Interstate 73 that would connect Michigan to Myrtle Beach, South Carolina.  It's been happening since Congress legislated the route in 1991.  Within Ohio, Interstate 73 generally follows the US 23 corridor from Portsmouth through Columbus to Toledo, and into Michigan. Since High Priority Corridor Five was created , Ohio has really done nothing to move forward with Interstate 73.  Sure, there have been feasibility studies here and there.  But actual dollars and construction just haven't occurred. The US 33 Nelsonville Bypass appears to have been built to Interstate standards. However, Ohio has been slowly upgrading US 33 to a full freeway through Southeastern Ohio.  Bypasses of Lancaster and Nelsonville opened in 2004 and 2013, respectively.  Other sections of two-lane road are being twinned, some to freeway or, at a minimum, to expressway standards.  Currently, a $274 million widening project in...

Local Sign Find - The last remnant of Business Interstate 95 between Kenly and Rocky Mount , NC

As you head north on Interstate 95 at Exit 107 for Kenly and US 301, you'll notice something odd about the overhead sign for the exit.  Peeling off the sign for all that can see is the word 'NORTH' off-center from the US 301.  This old sign (probably close to original from when this section of I-95 opened - more on that in a little bit) gives a hint to a short-lived Business Interstate Route that ran from here to Rocky Mount. The last hint of the Kenly-Wilson-Rocky Mount Business I-95 (Shaun White - August 2020) Interstate 95 in North Carolina has a unique history.  But one of the overlooked and forgotten pieces of Interstate 95 in North Carolina is the 38 mile section between Kenly and Rocky Mount.  When opened to traffic in late 1978, it was the next to last piece of Interstate 95 in North Carolina to open replacing a four lane US 301 from Battleboro through Rocky Mount and Wilson to eventually tying back into the Interstate in Kenly. Though it was not delayed in l...

Nostalgia fast food with style - Returning to Rax

Nostalgia. It sells. It evokes, and more accurately, warps memories of days gone by.  Things were better, simpler, and we eat it up. Nostalgia can make you drive three hours and over a hundred miles out of your way just to reconnect with a dying fast-food restaurant you last enjoyed in the early to mid-90s.  That person was me - that restaurant was Rax. I could go on about Rax's history, but in short, Rax was briefly a very popular roast beef fast-food chain.  Growing up in the 80s and early 90s in Western PA, Rax was the good fast-food spot.  The milkshakes.  (Personally, the chocolate chip milkshake was heaven.)  Uncle Alligator Kids Meal with the chocolate chip cookie. Take that McDonald's Happy Meal!  The fancy salad and hot foods bar.  Going to Rax was special.  Like so many similar restaurants, various investments, management decisions, etc., led Rax to almost disappear overnight.  By the time I graduated college in late 1999, abou...