Some 2010 Massachusetts Sign Photos

The recent holidays gave me an excuse to travel back to my home state and check out progress on the various highway projects, particularly signing projects, going on. While not much progress has been made on MA 3 , one old sign taken down (the original Exit 20 sign for I-93 South), nor on I-93 from Randolph to Boston (1% completed since last spring, a few blue gas/food/lodging signs), there has been new signage put up for other road construction related projects south of Boston.

1. The "128" Add-A-Lane Project. This project, which will add a fourth travel lane between the MA 24 Exit (Exit 4 on I-93/US 1) and the MA 9 Exit (Exit 20 on I-95/128), has started its lane adding-phase after several years of bridge reconstruction projects. Currently, work is mostly complete around the I-95 South interchange and is proceeding north (on I-95) toward the South US 1 Exit and north (on I-93) to MA 24 South exit (confused yet?). New signs started going up on I-95 toward US 1 last fall. Here are the only new ground-level signs on I-95/US 1/MA 128 after the I-95 north merge. Notice one new sign missing in the center?
No US 1 sign. None has ever been put up on the I-95 portion of '128' going this direction, while only 1 appears after the US 1 on ramp going southbound. Here's some of the newer overhead signs heading toward the US 1 South Exit:
Ironically, US 1 is the second ramp at the interchange and is mentioned first. You can see on the left with the widening the grass median has been replaced by cement barriers. This will be the case from MA 24 northward to just before US 1 where the median becomes much wider. Here you can contrast old (left) and new (right) overhead signs:
The final overhead assembly northbound (for now) is made up completely of new signage:
You can also see the sign on the road above has been replaced also, there are, as of now, no references to MA 128 along the road as existed before construction. Turning around now:
At the MA 109 exit, an old sign appears on a new VMS assembly. While the signs on this gantry are old:
The new bridge being built as part of the project can be seen behind it. They have added a new sign assembly 1/2 mile later:
Remnants of the old bridge can be seen on the right. On the road above the sign is new and you can make out a North US 1 trailblazer, but again, no MA 128 signs (there are no more until the 'End 128' sign at what MassDOT now refers to as the the I-93/95 split. The project has also produced a better advanced guide sign for I-93:
The previous sign was a small sign on the left with I-93 and I-95 shields and '2 miles'. This sign is not new, put up last summer, but it's one of the few signs I've seen in Mass. that has the distance in feet:
The posting of this sign allows me to digress by taking the exit ramp and seeing some of the unique signs on the streets around this exit. For example, at the intersection with University Avenue, if one is looking to access '128' North this is what you see:
A 'Mass. Green Sign' before a differentiation was made between state and US routes (Notice again no 128 sign). Turning the corner, however, one gets these signs:
Did we suddenly enter New Jersey? There is also another circle 128 sign across from the intersection in the distance (no photo). And after one turns around one can get directed to interstates directed in opposite directions:
The extra I-95 sign was apparently put up on behalf of unions. What will it read when updated to include US 1?

2. The Burgin Parkway Extension onramp project. This is another project now almost complete which involved moving access to MA 3 south and I-93 from the Parkway from a surface street to a flyover ramp to remove traffic accessing the Crown Colony office development near the Quincy Adams T Station (Exit 19 of off MA 3) from the onramp traffic. In the course of the project, new overhead signs were put up on the existing parkway and new ramp to match those being changed along MA 3. The previous overhead signs were after the T station, now the new first overhead sign is a 1/2 mile earlier and tries to fit in all the possible destinations:
As the road splits the signs provide more detail for the three destinations of traffic:
In this case, the split between the access point for the T Station and office park (the old route to the MA 3 ramps) and the new highway ramps. Notice the shield signs have MA 3 first. Definitely not correct according to MUTCD rules which say interstates should be listed first. However, since MA 3 and I-93 North go together, putting MA 3 after the I-95 shield would imply it is routed on I-93 to I-95 or I-93 South, which is not correct. This is not repeated in the next sign:
There are not, however, like the BGS sign assemblies on MA 3 North itself, any MA 3 or US 1 North trailblazers which are to be put on the right pole of the sign. While one for MA 3 does appear in the photo below (bottom right), sorry about the sun glare, no US 1 sign is present:
I did spot in Downtown Boston, US 1 and MA 3 shields added to a pole of one of the I-93 Big Dig tunnel entrance ramp overhead signs, did not have my camera though. Hopefully more will be put up this year, and maybe the Route 3 signage project will be completed. It appears only 4 more signs (on the Washington Street onramp, opposite where I was taking photos) need replacing, and the promised pole signage to be added, to complete the project which started in 2005. The I-93 project is to be done by 2012, but at the 1% a year pace, dare we say 2099?

Comments

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...