Skip to main content

Triangle Expressway Updates...Full Speed Ahead

With all the funding from a variety of sources in place, the North Carolina Turnpike Authority yesterday officially awarded the construction contracts of the 18.8 mile Triangle Expressway. If, and that's a big if, all goes well we will see the entire highway open to traffic in 2012.

Wilson, NC based S.T. Wooten Corp will build the 3.4 miles of the Triangle Parkway at a cost of $137.5 million. This will build the toll road from NC 147 in RTP to NC 540 at Davis Drive. The project will also include a toll plaza on NC 540.

Two companies - Archer Western Contractors of Atlanta and Granite Construction of Watsonville, CA - combined to create Raleigh/Durham Roadbuilders to extend NC 540 from its current end 12.6 miles south to the NC 55 Bypass in Holly Springs. That contract is worth $446.5 million.

2.8 miles of currently open - and free - NC 540 from Davis Drive to NC 55 near Apex will be incorporated into the toll road.

Surveying is to begin this week - and an official ground breaking ceremony will be held on August 12th.

Story Links:
Turnpike board starts spending for toll road ---Raleigh News & Observer
Turnpike Authority awards contracts for state toll road ---WRAL-TV

Commentary:
So it begins, after nearly two years of teasing, construction of North Carolina's first toll road is set to begin. The road will be opened in two segments; and depending on which news story you read, the road will be completed in its entirety by 2012 or 2013. Of course, if the NCTA is anything like the NCDOT it will most likely be delayed.

Here at the blog, we have three members of our team within ear shot of this project - myself, Brian LeBlanc, and Bob Malme. All three of us will be covering different parts of this project - from construction progress and delays - discovering what the TOLL NC Highway shields will look like - to any political obstacles that will inevitably get in the way.

Hopefully one or all three of us will be at the groundbreaking on August 12th and we'll be here to file a report.

Comments

Bob Malme said…
I'll plan to be there for the groundbreaking (given that this is a toll road, will there be an entrance fee?). If any divvying up of the project coverage would work, I'm happy to take on the Triangle Parkway segment since it's closest to me.

Popular posts from this blog

Crescent City Connection (New Orleans, LA)

The Crescent City Connection is a massive dual-span steel truss bridge that spans the lower Mississippi River at downtown New Orleans, about 95 river miles upstream from the mouth of the great river at the Head of Passes Light. If counted as a single bi-directional highway bridge, the parallel spans combine to form the single busiest bridge on the Mississippi River and its importance as a linchpin in the region’s transportation network cannot be overstated. While there have been various schemes over the years to construct bridges downriver from Algiers Point, this bridge has been the southernmost bridge on the Mississippi River since its initial construction in the 1950s. The years immediately following the end of World War II were a transformational period in the history of New Orleans. Already one of the great economic and cultural centers of the American Deep South, it was recognized at this time that major changes and improvements to the city’s transportation infrastructure would b...

Old US Route 99 through Tipton, Tulare, and Tagus Ranch

This summer I had a look into the alignment history of US Route 99 through the Tulare County communities of Tipton, Tulare, and Tagus Ranch.  While this slab below might seem like much it is one of the few remaining reminders of how US Route 99 was during the 1920s in Tulare County. This blog is part of the larger Gribblenation US Route 99 Page.  For more information pertaining to the other various segments of US Route 99 and it's three-digit child routes check out the link the below. Gribblenation US Route 99 Page Part 1; the history of US Route 99 in Tipton, Tulare, and Tagus Ranch Tipton and Tulare were both founded in 1872 as sidings of the Southern Pacific Railroad.  The Southern Pacific Railroad laid the groundwork for development of southern San Joaquin Valley.  Previous to the Southern Pacific Railroad travel via wagon or foot in Central California tended to avoid San Joaquin Valley in favor of the Stockton-Los Angeles Road.  The Stockton Los Ange...

Former US Route 101 and California State Route 41 through Paso Robles

Paso Robles is a city located on the Salinas River of San Luis Obispo County, California.  As originally configured the surface alignments of US Route 101 and California State Route 41 converged in downtown Paso Robles.  US Route 101 originally was aligned through Paso Robles via Spring Street.  California State Route 41 entered the City of Paso Robles via Union Road and 13th Street where it intersected US Route 101 at Spring Street.  US Route 101 and California State Route 41 departed Paso Robles southbound via a multiplex which split near Templeton.   Pictured above is the cover of the September/October 1957 California Highways & Public Works which features construction of the Paso Robles Bypass.  Pictured below is the 1935 Division of Highways Map of San Luis Obispo County which depicts US Route 101 and California State Route 41 intersecting in downtown Paso Robles.   Part 1; the history of US Route 101 and California State Route 41 i...