Skip to main content

Triangle Expressway Updates...Full Speed Ahead

With all the funding from a variety of sources in place, the North Carolina Turnpike Authority yesterday officially awarded the construction contracts of the 18.8 mile Triangle Expressway. If, and that's a big if, all goes well we will see the entire highway open to traffic in 2012.

Wilson, NC based S.T. Wooten Corp will build the 3.4 miles of the Triangle Parkway at a cost of $137.5 million. This will build the toll road from NC 147 in RTP to NC 540 at Davis Drive. The project will also include a toll plaza on NC 540.

Two companies - Archer Western Contractors of Atlanta and Granite Construction of Watsonville, CA - combined to create Raleigh/Durham Roadbuilders to extend NC 540 from its current end 12.6 miles south to the NC 55 Bypass in Holly Springs. That contract is worth $446.5 million.

2.8 miles of currently open - and free - NC 540 from Davis Drive to NC 55 near Apex will be incorporated into the toll road.

Surveying is to begin this week - and an official ground breaking ceremony will be held on August 12th.

Story Links:
Turnpike board starts spending for toll road ---Raleigh News & Observer
Turnpike Authority awards contracts for state toll road ---WRAL-TV

Commentary:
So it begins, after nearly two years of teasing, construction of North Carolina's first toll road is set to begin. The road will be opened in two segments; and depending on which news story you read, the road will be completed in its entirety by 2012 or 2013. Of course, if the NCTA is anything like the NCDOT it will most likely be delayed.

Here at the blog, we have three members of our team within ear shot of this project - myself, Brian LeBlanc, and Bob Malme. All three of us will be covering different parts of this project - from construction progress and delays - discovering what the TOLL NC Highway shields will look like - to any political obstacles that will inevitably get in the way.

Hopefully one or all three of us will be at the groundbreaking on August 12th and we'll be here to file a report.

Comments

Bob Malme said…
I'll plan to be there for the groundbreaking (given that this is a toll road, will there be an entrance fee?). If any divvying up of the project coverage would work, I'm happy to take on the Triangle Parkway segment since it's closest to me.

Popular posts from this blog

The Dummy Lights of New York

  A relic of the early days of motoring, dummy lights were traffic lights  that  were  placed  in the middle of a street intersection. In those early days, traffic shuffled through busy intersections with the help of a police officer who stood on top of a pedestal. As technology improved and electric traffic signals became commonplace, they were also  originally  positioned on a platform at the center of the intersection. Those traffic signals became known as  " dummy lights "  and were common until  traffic lights were moved  onto wires and poles that crossed above the intersection.  In New York State, only a handful of these dummy lights exist. The dummy lights  are found  in the Hudson Valley towns of Beacon and Croton-on-Hudson, plus there is an ongoing tug of war in Canajoharie in the Mohawk Valley, where their dummy light has been knocked down and replaced a few times. The dummy light in Canajoharie is currently out of commission, but popular demand has caused the dummy

Former US Route 101 and California State Route 41 through Paso Robles

Paso Robles is a city located on the Salinas River of San Luis Obispo County, California.  As originally configured the surface alignments of US Route 101 and California State Route 41 converged in downtown Paso Robles.  US Route 101 originally was aligned through Paso Robles via Spring Street.  California State Route 41 entered the City of Paso Robles via Union Road and 13th Street where it intersected US Route 101 at Spring Street.  US Route 101 and California State Route 41 departed Paso Robles southbound via a multiplex which split near Templeton.   Pictured above is the cover of the September/October 1957 California Highways & Public Works which features construction of the Paso Robles Bypass.  Pictured below is the 1935 Division of Highways Map of San Luis Obispo County which depicts US Route 101 and California State Route 41 intersecting in downtown Paso Robles.   Part 1; the history of US Route 101 and California State Route 41 in Paso Robles Paso Robles ("Pass of the

The Bayshore Freeway (US Route 101)

The Bayshore Freeway is a 56.4-mile component of US Route 101 located in the San Francisco Bay Area.  The Bayshore Freeway connects the southern extent of San Jose to the Central Freeway in the city of San Francisco.  The corridor was originally developed as the Bayshore Highway between 1923 and 1937.  The Bayshore Highway would serve briefly as mainline US Route 101 before being reassigned as US Route 101 Bypass in 1938.  Conceptually the designs for the Bayshore Freeway originated in 1940 but construction would be delayed until 1947.  The Bayshore Freeway was completed by 1962 and became mainline US Route 101 during June 1963.   Part 1; the history of the Bayshore Freeway Prior the creation of the Bayshore Highway corridor the most commonly used highway between San Jose and San Francisco was El Camino Real (alternatively known as Peninsula Highway).  The  American El Camino Real  began as an early example of a signed as an Auto Trail starting in 1906.  The era of State Highway Mainte