Skip to main content

Meet the New NCDOT, Same as the Old NCDOT?

My apologies to The Who.

This month's NCDOT Employee Newsletter features a column by Ted Vaden, Deputy Secretary for Internal and External Affairs, the agency's director of communication. The article (available here:
http://www.ncdot.gov/_templates/download/external.html?pdf=http%3A//www.ncdot.org/download/newsroom/Newsletter.pdf starting on page 2) states that NCDOT is one of the best transportation departments in the country but that past management has not been able to get that news out very well by largely just reacting to reports of NCDOT making mistakes after the fact. The new agency management says it's committed to better, more accurate communications, and being more proactive in pushing NCDOT's positive news. The article indicates that the NCDOT Secretary, as part of this new proactive process, has been traveling around the state to public forums in an attempt to change the public perception about NCDOT that it is better at wasting taxpayer's dollars than building roads.

Well,
funny they should be touting better communication this month. Seems NCDOT, over the next two weekends, is going to be closing what is once again part of Interstate 40, and Business 85, inside the Greensboro Urban Loop to perform a repaving project, one direction closed each weekend. They sent out a news release to the Greensboro paper and included a map of the detours to get around the construction. One problem, both the release and map, (you can access the map by pasting in the link here:
http://mm.news-record.com/drupal//files/documents/traffic_detours_may_2009.pdf
) refer to the old route alignments which NCDOT, in another release a couple weeks ago, stated they were starting the process of changing. As seen in the previous post, almost all the Business 40 signs have been replaced by Interstate 40 along I-40's original alignment. But the release and map refer and show Business 40 through Greensboro and tell how to bypass it using I-40/I-73, I-40/85, etc. which, technically where the signs haven't been changed, do not exist. The map includes I-40 exit numbers both on the old and new alignments as well as Business 40 exit numbers along I-40 west of Business 85, of which only the exit gore sign numbers were ever changed.The Greensboro N&R dutifully put up the text and map on their website. They eventually redid their text when a reader (not me) commented about the paper using the old route designations and pointing out they had an article the week or so before listing all the route and exit number changes. The paper apologized, saying they hadn't checked the news release close enough before publishing it. (I eventually added a comment myself in response to a question in a previous comment).

Commentary:
Hmm, it still appears that NCDOT's right hand still doesn't know what it's left hand is doing. This occurred within the same department, public relations, to boot. Wasn't this going to change under the new administration? Let's hope they have better luck laying a new surface on I-40 in Greensboro than in Durham. You cannot dictate policy changes from above and have them automatically filter down throughout an entire organization. Communication at NCDOT has been a problem for a long time. Saying you're going to be more accurate doesn't suddenly mean that you'll have the same employees double-check
ing press releases for mistakes. (I hope this release was done by a different person at least, not that that's a real excuse.) It would also be helpful for NCDOT if the media would do its job and check facts before publishing something. By apparently assuming, like the Greensboro N&R did, that this release should have no problems with it, it only compounded the original mistake. It should not take a reader to inform a paper that the facts of an article are wrong. Don't any of the paper's employees, or NCDOT's for that matter, drive I-40?

Maybe the first stop for Secretary Conti on his better communications road trip should have been to the NCDOT press office.

Comments

Popular posts from this blog

The case to move Interstate 73 in Southern Ohio onto US 33

Every decade or so, Ohio pushes to revisit the proposed Interstate 73 that would connect Michigan to Myrtle Beach, South Carolina.  It's been happening since Congress legislated the route in 1991.  Within Ohio, Interstate 73 generally follows the US 23 corridor from Portsmouth through Columbus to Toledo, and into Michigan. Since High Priority Corridor Five was created , Ohio has really done nothing to move forward with Interstate 73.  Sure, there have been feasibility studies here and there.  But actual dollars and construction just haven't occurred. The US 33 Nelsonville Bypass appears to have been built to Interstate standards. However, Ohio has been slowly upgrading US 33 to a full freeway through Southeastern Ohio.  Bypasses of Lancaster and Nelsonville opened in 2004 and 2013, respectively.  Other sections of two-lane road are being twinned, some to freeway or, at a minimum, to expressway standards.  Currently, a $274 million widening project in...

Local Sign Find - The last remnant of Business Interstate 95 between Kenly and Rocky Mount , NC

As you head north on Interstate 95 at Exit 107 for Kenly and US 301, you'll notice something odd about the overhead sign for the exit.  Peeling off the sign for all that can see is the word 'NORTH' off-center from the US 301.  This old sign (probably close to original from when this section of I-95 opened - more on that in a little bit) gives a hint to a short-lived Business Interstate Route that ran from here to Rocky Mount. The last hint of the Kenly-Wilson-Rocky Mount Business I-95 (Shaun White - August 2020) Interstate 95 in North Carolina has a unique history.  But one of the overlooked and forgotten pieces of Interstate 95 in North Carolina is the 38 mile section between Kenly and Rocky Mount.  When opened to traffic in late 1978, it was the next to last piece of Interstate 95 in North Carolina to open replacing a four lane US 301 from Battleboro through Rocky Mount and Wilson to eventually tying back into the Interstate in Kenly. Though it was not delayed in l...

Nostalgia fast food with style - Returning to Rax

Nostalgia. It sells. It evokes, and more accurately, warps memories of days gone by.  Things were better, simpler, and we eat it up. Nostalgia can make you drive three hours and over a hundred miles out of your way just to reconnect with a dying fast-food restaurant you last enjoyed in the early to mid-90s.  That person was me - that restaurant was Rax. I could go on about Rax's history, but in short, Rax was briefly a very popular roast beef fast-food chain.  Growing up in the 80s and early 90s in Western PA, Rax was the good fast-food spot.  The milkshakes.  (Personally, the chocolate chip milkshake was heaven.)  Uncle Alligator Kids Meal with the chocolate chip cookie. Take that McDonald's Happy Meal!  The fancy salad and hot foods bar.  Going to Rax was special.  Like so many similar restaurants, various investments, management decisions, etc., led Rax to almost disappear overnight.  By the time I graduated college in late 1999, abou...