Skip to main content

Public apathetic about I-485 construction delays

For all the bluster made by local politicians about the NCDOT's decision to push back the completion of I-485 two years in addition to delaying the widening of the Interstate in Southern Mecklenburg County, one would think that the general public would have had an equally loud outcry about these two transportation issues.

Well, guess what...if you thought that...you were wrong.

Now I know, I am nearly two months behind in reporting this story...but it's still worth mentioning today.

At a January public hearing on the 2009-2015 NCDOT Draft Transportation Improvement Project List held in Charlotte, only four people showed up and not one spoke about the decision to delay Interstate 485. Furthermore, as of the January hearing date, the DOT had not received any letters or e-mail comments from the general public about the proposed pushback in construction. The only commentary that had been received at that point were from various politicians (which has been reported and commented on in this blog).

As a result of the lack of feedback on the decision - and the grim reality of shortfalls in transportation funding within North Carolina - it is almost certain that the two year delay in construction of both projects on I-485 will occur.

Ok, so I am guilty of not sending a message to the NCDOT either, and it's mainly because there are so many projects within the state, and the issue to me is not where the I-485 projects fall in line for funding or priority rankings; rather, the issue to me is the current funding system within North Carolina for transportation projects. Whether it is the district equity funding programs, the raiding of Highway Trust Fund monies for General Fund purposes by the state legislature, or various DOT practices that have ended up costing more money to complete past projects, these issues to me are more important to be address and fixed vs. moving the completion of the I-485 loop ahead two years or not. It won't be until these issues are addressed within the DOT and down the street here in Raleigh by our legislature that delays and funding gaps like these will be lessened if not eliminated.

Story: I-485 delay looks to be done deal ---News 14 Carolina

Comments

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...