Skip to main content

Erie Blvd. in Schenectady, NY to get visual makeover

In a recent article of the Albany Times-Union, there was a story that plans for a visual makeover of Erie Blvd. in Schenectady were announced. The changes would take place on Erie Blvd. from I-890 and the entrance to General Electric to Union St.

Currently six lanes wide until State St., Erie Blvd. would be reduced to four lanes from 890 to State St. Erie Blvd. is quite possibly the most historic thoroughfare in Schenectady. Once, the Erie Canal flowed along its alignment. Later, after the canal was filled in, Erie Blvd. was the gateway to the city's largest employer, General Electric.

The changes - besides reducing the lanes - would include a roundabout at South Ferry St., pedestrian crosswalks, a landscaped median, and street lighting. The goal is to make one of the city's busiest highway's more visually appealing.

Construction would start in 2009 and last through 2011.

An idea of what Erie Blvd could look like. (Clough Harbour and Associates/Albany Times-Union

Here's a few shots of Erie Blvd. that Doug took today:

This is the beginning of Erie Blvd. - and the start of the proposed project - at I-890 and General Electric. Doug is traveling North on Erie Blvd. throughout.


The next two photos are on Erie Blvd. at South Ferry Blvd. This is where the proposed roundabout would go. The roundabout would allow traffic to reverse direction on Erie Blvd. A maneuver that is considerably dangerous today.



Erie Blvd. at State Street (NY 5). This intersection is rather congested during afternoon and evening rush hours. This is also where most of the major changes to Erie Blvd. will end.


Finally, beyond State St. to Union, possible improvement include a small median. As you can see, the road is much narrower here than it is at I-890.


Story: Erie Boulevard makeover unveiled ---Albany Times-Union

Commentary:
From August through December of 2006, Erie Boulevard was part of my commute to work. We moved our office to Erie Blvd. from Rotterdam that August. I will say that the makeover would make Erie Boulevard a more visually appealing drive.

However, sticking points at I-890 and State Street will continue. The roundabout at South Ferry St. will certainly allow for safer traffic movements. The roundabout along with other changes to Erie Boulevard will slow down traffic and make the road more pedestrian friendly. But will this encourage business along the corridor? Who knows, there are a few businesses and some fast food spots from 890 to State St. But overall, there's a lot more that will be needed along Erie Boulevard for it and Schenectady to be as active as it once was over 30 years ago.

The makeover is a great thing and a good start. But there's a lot more needed and hopefully will be done to breathe life into a stagnant city.

Comments

Popular posts from this blog

West Canyon Road (Snow Canyon State Park)

West Canyon Road is an approximately four-mile dirt service road located in Snow Canyon State Park.  West Canyon Road follows Snow Canyon from the Whiptail Trail to the northern State Park boundary and intersects numerous trailheads.   West Canyon Road was the original main road through Snow Canyon after it was designated as a Utah State Park in 1957 and opened to the public in 1962. Part 1; the history of West Canyon Road Snow Canyon is located in the Red Mountains north of the city of Ivins in Washington County, Utah.  Snow Canyon is one of many sandstone canyons located in the Red Mountains.  Part of the extinct Santa Clara Volcano punctured the Red Mountains via lava tubes. From approximately the year 200 to 1,250 the area around Snow Canyon was inhabited by the Ancestral Puebloans.  Mormon pioneers established Santa Clara south of Snow Canyon in 1854.  Local legend has it that the settlers discovered Snow Canyon in the 1850s while searching for m...

Indian Gulch Extension and the Indian Gulch ghost town site

Indian Gulch Extension is an approximately 6-mile-long rural highway corridor in the Sierra Nevada foothills of western Mariposa County.  Indian Gulch Extension begins at Indian Gulch Road near the namesake ghost town of Indian Gulch.  From the ghost town site Indian Gulch Extension extends southwesterly to the Merced County line where it becomes Waltz Road.   The former Gold Rush era community of Indian Gulch which was settled near Santa Cruz Mountain in 1849 and had standing structures until the early 1970s.  What is now Indian Gulch Extension was approved for construction by the Mariposa County Commissioners in 1862.  The purpose of the corridor was to provide Indian Gulch with a direct connection westward with the greater Stockton-Los Angeles Road.  The Stockton-Los Angeles Road would go onto define much of the Mariposa County and Merced County line.  Part 1; the history of Indian Gulch and Indian Gulch Extension Indian Gulch Road is named aft...

The reemergence of US Route 99 at the Ventura Freeway/Golden State Freeway interchange

During April 2023 a portion of the sign gantry on the eastbound Ventura Freeway (California State Route 134) approaching the Golden State Freeway (Interstate 5) fell.  The fallen portion of the sign gantry revealed a once covered US Route 99 shield.  The uncovered US Route 99 sign (blog cover courtesy Ian Ligget) is a 1956-63 era freeway specification US Route shield.  This blog will explore in brief how the Golden State Freeway was developed as US Route 99 and US Route 6 before becoming solely Interstate 5.   This blog is part of the larger Gribblenation US Route 99 Page.  For more information pertaining to the other various segments of US Route 99 and it's three-digit child routes check out the link the below. Gribblenation US Route 99 Page Part 1; visiting the US Route 99 shield at the Ventura Freeway/Golden State Freeway Interchange As noted in the introduction the US Route 99 shield can be seen on the eastbound Ventura Freeway (California Sta...