Skip to main content

Road Trip to the Future

I took a few hours this past Saturday (2/27) to check out the progress on several projects that will help shape the future of driving in Massachusetts and beyond. Most notably, wider roads, electronic tolling, and milepost-based exit numbers.

1. Wider Roads
The longest construction project going on in the Metro Boston area is the '128-Add-A-Lane' Project, to create a fourth travel lane on I-93 and I-95 from MA 24 in Randolph to MA 9 in Wellesley. The work is now concentrated on the last section north of Great Plain Avenue in Needham. The work includes adding a fourth lane to the median:

Replacing bridges over the highway, such as this one for Kendrick Street, now completed:

Building a new off-ramp from Kendrick Street, in progress:

And, revising the interchange with MA 9:

The whole project is due to be completed by 2019.

2. Electronic Tolling
MassDOT having instituted electronic tolls on the Tobin Bridge in 2014, is now in the process of doing the same for the Massachusetts Turnpike. New electronic toll gantries have been going up across the roadway in the past several months. The first to go up was in Weston near the State Police Barracks:

This is to capture the EZ-Pass tags or license plate of vehicles traveling between the I-95/128 and the MA 30 exits. Other more recently placed gantries include one just after the Framingham Service Plaza Westbound:

That will capture traffic between the MA 30 and MA 9 exits, and this next one:

That is placed between the exits for MA 9 and I-495. There were also a couple supports placed for future gantries between the I-495 exit and MA 122 and this one approaching the Charlton Service Plaza between the interchanges for I-395/I-290/MA 12 and I-84 in Sturbridge:

MassDOT plans to have the electronic tolling system up and running by October 2016.

3. Milepost Based Exit Numbering
MassDOT recently awarded a contract to revise the exit numbers along the state's interstates and other route expressways from consecutive numbers to those based on mileposts. The work is suppose to be complete by early 2018. One of the first routes rumored to be revised is I-84 due to its short length. I exited the Mass Turnpike (under a separate contract that will replace all the exit signs and change the exit numbers, nothing was seen in the first project's work zone west of Auburn) at what will be future Exit 78:

But only saw the new exit signage put up a few years ago, not new numbers. I took a few photos anyway for historical purposes. Here's the signage for future Exits 6A and 6B:

Here's a future 1-Mile overhead advance sign for Future Exit 5:

And here's the signage for Future Exit 3:

Although Massachusetts has not started its renumbering yet, Connecticut has completed its work renumbering its portion of I-395. Since the first exit on I-395 South in Connecticut is actually 2/10's of a mile north of the border. This sign has the claim to be the first sign in Massachusetts with a milepost-based exit number:
It appears that a Connecticut exit tab was place over the existing 'Exit 100' tab on the Massachusetts sign. If you haven't checked it out yet, feel free to visit My List of Current and Future Massachusetts Exit Numbers

Since I was heading across the border, I thought I'd try to capture some of the newer signs placed since my Last Visit in November . This is the first sign in Connecticut for Exit 53, notice the Old Exit # tab is on the 1/2 mile advance sign, rather than the I-Mile sign elsewhere:

Unfortunately, signs southbound will suffer from some glare from the February sun. Here's the next sign in the series at the exit ramp:

And the new gore sign with the Old Exit # Tab, the only former 3-digit exit on the route:

The next new exit number is 50 for the CT 200 exit in Thompson, the 1-Mile Advance:

Followed by new 1/2 Mile advance, with a Service logo tab on the bottom, but in green, not blue   :

Just after the exit, here's the I-395 Mile 50 marker:

And the new version of the South I-395 Reassurance Marker:

The next new exit number is 47 for US 44 in Putnam:

The exit is almost immediately followed by an exit that leads to CT 12 which parallels I-395:

The next sign for New Exit 46, again featuring a service logo tab on the sign:

The next exit sign is for Kennedy Drive, New Exit 45, however:

It is before the Exit 46 off-ramp:

The first exit south of Putnam is New Exit 43 for Attawaugan / Ballouville:

Followed by signs for CT 101, New Exit 41 in Dayville:

Here's the one mile advance for CT 101 after I turned around at US 6:

And the 1/2 mile advance, this exit has separate blue service logo signs:

Here's the gore sign at the exit:

Between CT 101 and US 6 there is an exit for S.Killingly/Danielson, New Exit 38:

Followed by the US 6 Exit in Danielson, New Exit 37:

The 1-Mile advance being for the US 6 West Exit. This is followed by new overhead signage on the old sign gantry, the first appearance of US 6 East:

This is followed by more overheads approaching the US 6 West exit:

While ground-mounted signage follows for US 6 East follows:

This is where I got off and turned around to head back to CT 101:
The gore sign seems a little too wide here.

Here's some Exit 37 and Exit 38 signage heading back northbound:

Hopefully, I'll have photos of new exit number signs in Massachusetts soon.

Comments

Popular posts from this blog

Did Caltrans just kill the G26 cutout US Route shields?

The US Route System was formally created by the American Association of State Highway Officials during November 1926.  Through the history of the system the only state to which has elected to maintain cutout US Route shields has been California.  The G26 series cutout US Route shields have become a favorite in the road enthusiast hobby and are generally considered to be much more visually pleasing than the standard Federal Highway Administration variant.  However, the G26 shield series appears to have been killed off on January 18, 2026, when Caltrans updated their Manual of Uniform Traffic Control Devices.  This blog will examine the history of the US Route shield specifications in California and what is happening with the 2026 changes.  The blog cover photo is facing towards the terminus of California State Route 136 and at a G26-2 specification US Route 395 shield.  In the background Mount Whitney can be seen in the Sierra Nevada range.   ...

May 2023 Ontario Trip (Part 3 of 3)

  Over the years, I have made plenty of trips to Ontario, crisscrossing the southern, central and eastern parts of the province. Living in Upstate New York, it's pretty easy to visit our neighbor to the north, or is that our neighbor to the west? Ottawa is one of my favorite cities to visit anywhere in the world, plus I've discovered the charm of Kingston, the waterfalls of Hamilton (which is on the same Niagara Escarpment that brings us Niagara Falls), the sheer beauty of the Bruce Peninsula, and more. But I hadn't explored much of Cottage Country. So I decided to change that, and what better time to go than over Memorial Day weekend, when the daylight is long and I have an extra day to explore. On the third and final day of my trip, I started in Huntsville and made my way through Muskoka District and Haliburton County, passing by many lakes along the way. I stopped in towns such as Dorset, Haliburton and Bancroft before making a beeline down to Belleville and then over th...

Ghost Town Tuesday; Nichols, FL

A couple years ago I spent a lot of spare time exploring phosphate mining ghost towns in the Bone Valley of Polk County, Florida.  One ghost town in particular called Nichols on Polk County Route 676 west of Mulberry caught my eye due to a relative lack of documentation on ghosttowns.com. Nichols was created in 1905 during the early phosphate mining boom in the Bone Valley region.  For the time Nichols was unusual since it had company housing in the Nichols Mine site and private residences outside the gate.  Nichols is only about two miles west of Mulberry which probably made it a somewhat reasonable commute even by the wonky standards of the early 20th Century.  Most of the Bone Valley region was relatively remote which made commuting or homesteading impractical which is why there are so many ghost towns in the area.  The company housing section of Nichols was phased out and abandoned by 1950. The Nichols town site is largely abandoned and could "possibl...