Skip to main content

Tour of the now opened Phase II of the Triangle Expressway

VMS announcing hey the road just opened today...you'll be tolled tomorrow

The second phase of the Triangle Expressway from NC 55 near Apex southwards to US 64 opened on August 1st.  It was the only free day for the new highway as tolls on the new highway would go into effect the following day Thursday, August 2nd.  So we had an impromptu Triangle Road Meet and six of us met up at Trali in Brier Creek to check out the new road.  Not bad for 48 hour notice!

126

We had a small surprise when we got to I-40.  First Lady Michelle Obama was in town and we just caught her motorcade getting onto I-540 East headed back to RDU.   Here's the temporary roadblock at the ramp from 540 East to 40 East.

127

So now lets get back to touring Phase II of the Triangle Expressway.

Toll NC 540 begins in a half mile

Last Exit before toll and by the way Tolls begin tomorrow.

Some of the signs on the now truncated NC 540 (Free) approaching the NC 54 interchange.  This is the only free interchange south of I-40.  If you look closely enough at the bottom of the second photo, you will seen an 'END' sign for the free portion of NC 540.

135

The overhead toll gantries at the NC 540 and NC 147 tolled interchange.  They now work.

NC 540 Toll South approaching NC 55

Overhead for NC 55 with the decorative style all sign posts have along the Triangle Expressway.

139

And here we are on the newly opened road.  People are taking advantage of the only 'free' day on the new highway.

141

These pedestal sign gantries are getting more popular in North Carolina.

143

The next overhead toll gantry just prior to the Green Level West Road interchange on NC Toll 540 South.

150

It's a quick drive to the new south end of the highway at US 64 in Apex.

156

Looking Southbound at the current construction that will extend the highway to NC 55 in Holly Springs.  This next segment should be open in January 2013.

158

Close-up of the more decorative style for bridges and overpasses along the TriEx.

159

Overheads on US 64 East to go onto NC 540 North.  Surprisingly, there aren't any exit numbers based on US 64 mileage here.

162

Getting back on to the TriEx at US 64 - a on-ramp overhead toll gantry greets you.

167

Morrisville Parkway isn't ready for traffic just yet

Just north of the Green Level West Road interchange is a ghost bridge for Morrisville Parkway.  The NCTA built the bridge for whenever Morrisville Parkway will be extended.  There is no current date for filling in the nearly two mile gap of Morrisville Parkway between NC 55 and Green Level Church Road.  There also are plans to build an interchange with the TriEx at Morrisville Parkway in the future.  However, no grading for a future interchange was apparent.

Overheads approaching Exit 67

Now back on what was once Free NC 540 and now Toll NC 540 approaching the interchange with NC Toll 147. 

TOLL NC 540 ENDS - FREE NC 540 BEGINS

Finally, just prior to the NC 54 interchange this guide sign informs drivers of the end of the tolled section of NC 540 and the beginning of the free section of NC 540. 

Start of I-540 East - Exits 1B and 2

NC 540 doesn't last long for about a mile later is Interstate 40 and NC 540 becomes Interstate 540.  Lots of different '540's I know.  For my entire set on flickr, head here.

Comments

Popular posts from this blog

Crescent City Connection (New Orleans, LA)

The Crescent City Connection is a massive dual-span steel truss bridge that spans the lower Mississippi River at downtown New Orleans, about 95 river miles upstream from the mouth of the great river at the Head of Passes Light. If counted as a single bi-directional highway bridge, the parallel spans combine to form the single busiest bridge on the Mississippi River and its importance as a linchpin in the region’s transportation network cannot be overstated. While there have been various schemes over the years to construct bridges downriver from Algiers Point, this bridge has been the southernmost bridge on the Mississippi River since its initial construction in the 1950s. The years immediately following the end of World War II were a transformational period in the history of New Orleans. Already one of the great economic and cultural centers of the American Deep South, it was recognized at this time that major changes and improvements to the city’s transportation infrastructure would b...

Old US Route 99 through Tipton, Tulare, and Tagus Ranch

This summer I had a look into the alignment history of US Route 99 through the Tulare County communities of Tipton, Tulare, and Tagus Ranch.  While this slab below might seem like much it is one of the few remaining reminders of how US Route 99 was during the 1920s in Tulare County. This blog is part of the larger Gribblenation US Route 99 Page.  For more information pertaining to the other various segments of US Route 99 and it's three-digit child routes check out the link the below. Gribblenation US Route 99 Page Part 1; the history of US Route 99 in Tipton, Tulare, and Tagus Ranch Tipton and Tulare were both founded in 1872 as sidings of the Southern Pacific Railroad.  The Southern Pacific Railroad laid the groundwork for development of southern San Joaquin Valley.  Previous to the Southern Pacific Railroad travel via wagon or foot in Central California tended to avoid San Joaquin Valley in favor of the Stockton-Los Angeles Road.  The Stockton Los Ange...

Former US Route 101 and California State Route 41 through Paso Robles

Paso Robles is a city located on the Salinas River of San Luis Obispo County, California.  As originally configured the surface alignments of US Route 101 and California State Route 41 converged in downtown Paso Robles.  US Route 101 originally was aligned through Paso Robles via Spring Street.  California State Route 41 entered the City of Paso Robles via Union Road and 13th Street where it intersected US Route 101 at Spring Street.  US Route 101 and California State Route 41 departed Paso Robles southbound via a multiplex which split near Templeton.   Pictured above is the cover of the September/October 1957 California Highways & Public Works which features construction of the Paso Robles Bypass.  Pictured below is the 1935 Division of Highways Map of San Luis Obispo County which depicts US Route 101 and California State Route 41 intersecting in downtown Paso Robles.   Part 1; the history of US Route 101 and California State Route 41 i...