Skip to main content

Feds give go ahead to the Garden Parkway

I apologize that I haven't blogged about this topic in awhile.

Last week, the Federal Highway Administration awarded a favorable 'Record of Decision' to the North Carolina Turnpike Authority for the route of the proposed Garden Parkway in Mecklenburg and Gaston Counties.  The decision is a blow to citizen group's that are opposed to the route.

Opposition groups will now focus on some of the environmental and financial hurdles the route still needs to clear.

The NCTA plans to finance the project from toll revenue, bond financing, and GARVEE funds.  But another key part of financing is approval from the state legislature of $17.5 million this year and then additional $35 million per year over the next 40 years.

The total cost of the 22 mile highway is $930 million.

The state plans to build the new toll road through two design-build projects.  The first design build project will build a four lane limited access highway from I-485 near Wilson Farm Roadin Mecklenburg County westward to US 321 south of Gastonia.  The second project will build a two-lane, known as a 'Super Two', limited access highway from US 321 north and westwards to Interstate 85 near Bessemer City.

Along the two lane section, the NCTA will purchase the right-of-way for four lanes with the intention to build the entire highway at a later date.  The Turnpike Authority hopes to begin construction in the Summer of 2013 and have the first segments of the highway open to traffic in 2015.

Tolls for highway are estimated at 15 cents per mile or about $3.30 for a one way trip.  Like the Triangle Expressway in Raleigh, all tolls will be collected electronically.

The NCTA has to await for all environmental permits to be approved.  Input and approval from the Army Corps of Engineers and the NC Division of Water Quality is still needed for any construction to move forward.  Opponents of the highway are pointing to previous concerns by the Environmental Protection Agency and the Army Corps of Engineers as important obstacles in their favor. 

There is no timetable on when any of the environmental permits or financing approval will occur.

Story Links:
NC Turnpike Authority receives final approval for Garden Parkway Route ---WBTV-TV
Garden Parkway clears key federal hurdle ---Gaston Gazette
Construction on Garden Parkway could start next year ---WSOC-TV
Garden Parkway Route Finalized, Toll Likely $.15/mile ---WFAE-FM

Commentary:
Unlike the I-95 project, I am against this toll road.  It is unnecessary - the real need is a US 321 bypass of Gastonia, which this project will not include.  Gaston County residents are against this toll road by a nearly 3:1 margin.  And it has become a political issue within the county.  State legislators are being asked if they are for or against the highway making it an issue in the primary and the general elections.

The Summer 2013 construction date by no means is set in stone.  First, state funding for the highway has been delayed as a result of budget cuts.  There is a possibility it will return in the 2012-2013 budget and/or future budgets.  Also, the prior concerns by the Army Corps of Engineers and other government environmental agencies could cause changes to the routing and even the cost of the project.  And of course, various groups like the Southern Environmental Law Center could file lawsuits.

Local groups like Stop The Toll Road have been fighting the project every step of the way.  I don't expect them to go down quietly either.

Whether opponents of toll roads like it or not, the toll idea within North Carolina is here to stay.  With numerous needs to maintain, repair, and replace existing roads and infrastructure and the demand to build new highways to keep up with an increasing population - there is only so much money to go around.  However, you can't just have a toll road just because you want to build a highway.  There has to be a legitimate need and the Garden Parkway isn't a legitimate need.  Especially not as a toll road. 



Comments

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...