Skip to main content

Trip to NCDOT's 'I-95 Citizens Informational Workshop'

On Monday, August 23 I drove to Wilson to attend NCDOT's Informational Workshop for the 'Interstate 95 Corridor Planning and Finance Study' or 'Driving 95' project held from 4-7PM at the Ellis Convention Center. This meeting was one of 7 meetings held from mid to late August. The purpose according to NCDOT is 'to provide information regarding the proposed study and obtain public input' or as I heard one NCDOT official say, so that after we run our models to develop a plan, no one can say 'you screwed up by forgetting the problems at this or that interchange' in your plan.

NCDOT itself says it hasn't done a lot of work itself on the I-95 just, the displays and maps were presented by representatives of 2 contractors. It was this data presented by the contractors that NCDOT wanted feedback. One contractor had gone the length of I-95 and determined any problems at each interchange. They also looked at problems with I-95 itself between exits. They took traffic counts from which they determine a Level of Service Ranking (A-D, F) for today and produced a model for what the service rank would be in 2040 if no action were taken. For most, not surprisingly, the LOS in 2040 was ranked D or F. Another firm looked at the environmental factors and historic structures (those older than 50 years) within 1000' of each side of I-95 to determine what obstacles may be in the way of construction, or restrict the highway right-of-way. Ideally, NCDOT would like to use the median to add lanes to save money, but that may not be possible in some places. The ideal outcome for these studies and comments are segmented plans for the entire I-95 corridor. One stretch may need to be widened to 8 lanes requiring rebuilding not only the road but bridges, overpasses and interchanges within 5 years to avoid extreme congestion while another area may not have to be widened until 2025, and, for now may only need some curves to be straightened to increase sight distances. Separate EIS reports would be created for each segment to be submitted to the FHWA for approval. The more segments spread out over many years, the less money NCDOT would have to need annually for I-95 projects.

The meeting did bring up financing options for paying for all this. These included raising the state gas tax or registration fee, enacting a local sales tax, public-private partnerships, and tolls. Since they had a couple extra posters on tolls, you could sense that's where NCDOT is leaning as of now. The tolling would be completely electronic, like that being placed on the Triangle Expressway (NC 540) near Raleigh. They did say the were considering either open road tolling (which would allow some free travel if one gets on and off between toll facilities), or those placed at interchanges which would mean anyone getting off the highway would pay. This information session was for the first part of the project, they are planning two more steps that will include public involvement over the next 2 years. Click the Blog Entry title to link to NCDOT's official study website.

Other observations on the trip down and back:
New signs, they have put up new signs at the US 64/264 interchange that don't need to be lighted, but like with the Durham freeway, the replacement signs do not bother to correct mistakes or update information. Thus heading east on 264, one still comes to signs splitting traffic to East or West 64, no mention that 264 continues on 64 East.
I-795 repaving, since I got to Wilson before 4, I took a drive down I-795 to just over the Wilson County line. I wanted to see what progress there had been in repaving, due to be done by this fall. It appears to be ahead of schedule with all of the freeway I drove having new asphalt on it into Wayne county. Traffic in the first 10 miles southbound was restricted to the left lane, though construction was only occurring in a 1/4 mile stretch on the shoulder. The road was quite smooth in both directions, just shows you what NCDOT can accomplish when the job is done twice.
None of the overheads on US 264 or I-795 had been changed. Sorry I have no photos, it was raining on and off both down and back, so I decided not to bring the camera.

Comments

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...