Skip to main content

NCDOT Approves I-74 'Widening'

On the same day NCDOT announced a major reorganization to make it more efficient and less prone to errors they also announced the winning bids for several construction contracts. These included the design-build contract for the remainder of the US 311 bypass (I-74), 7.9 miles from Spencer Road to US 220. Construction is to start September 2 and the project is to be completed by 2012. It will be built using GARVEE bond funds. The one problem though is that in all press releases for this project they refer to the project as a 'widening.'

See the press release HERE.

Comments: At least it appears they got the mileage for the project correct this time. They still insist the 10+ mile section now under construction is about 6 miles long. I guess it's two steps forward and one step back, so I guess that counts as progress.

Speaking of the existing I-74 project from Business 85 to Spencer Road that is due to be finished in 2011, it is almost twice ahead of schedule as projected (40% vs 21%). A source that lives nearer the construction site took a look at the I-85 interchange area yesterday and said many of the bridges are now paved along with one of the C/D ramps they're building along I-85 which was being used by construction equipment. I may be out that way next week, if so I'll try to post some photos.

Comments

Bob Malme said…
When I saw no change yesterday in the press releases indicating that the new I-74 contract was for widening, I decided to e-mail the communications office. I pointed out that this was an error and that the project press release should indicate the design-build contract was for constructing a new roadway.

I guess NCDOT's new mantra of responding more quickly to the public is true in this case. If you click the link above to the press release you will notice a smaller type 'Constructing' has replaced 'Widening' in the first sentence. If only they were as quick as this in correcting sign errors.

Popular posts from this blog

West Canyon Road (Snow Canyon State Park)

West Canyon Road is an approximately four-mile dirt service road located in Snow Canyon State Park.  West Canyon Road follows Snow Canyon from the Whiptail Trail to the northern State Park boundary and intersects numerous trailheads.   West Canyon Road was the original main road through Snow Canyon after it was designated as a Utah State Park in 1957 and opened to the public in 1962. Part 1; the history of West Canyon Road Snow Canyon is located in the Red Mountains north of the city of Ivins in Washington County, Utah.  Snow Canyon is one of many sandstone canyons located in the Red Mountains.  Part of the extinct Santa Clara Volcano punctured the Red Mountains via lava tubes. From approximately the year 200 to 1,250 the area around Snow Canyon was inhabited by the Ancestral Puebloans.  Mormon pioneers established Santa Clara south of Snow Canyon in 1854.  Local legend has it that the settlers discovered Snow Canyon in the 1850s while searching for m...

Indian Gulch Extension and the Indian Gulch ghost town site

Indian Gulch Extension is an approximately 6-mile-long rural highway corridor in the Sierra Nevada foothills of western Mariposa County.  Indian Gulch Extension begins at Indian Gulch Road near the namesake ghost town of Indian Gulch.  From the ghost town site Indian Gulch Extension extends southwesterly to the Merced County line where it becomes Waltz Road.   The former Gold Rush era community of Indian Gulch which was settled near Santa Cruz Mountain in 1849 and had standing structures until the early 1970s.  What is now Indian Gulch Extension was approved for construction by the Mariposa County Commissioners in 1862.  The purpose of the corridor was to provide Indian Gulch with a direct connection westward with the greater Stockton-Los Angeles Road.  The Stockton-Los Angeles Road would go onto define much of the Mariposa County and Merced County line.  Part 1; the history of Indian Gulch and Indian Gulch Extension Indian Gulch Road is named aft...

The reemergence of US Route 99 at the Ventura Freeway/Golden State Freeway interchange

During April 2023 a portion of the sign gantry on the eastbound Ventura Freeway (California State Route 134) approaching the Golden State Freeway (Interstate 5) fell.  The fallen portion of the sign gantry revealed a once covered US Route 99 shield.  The uncovered US Route 99 sign (blog cover courtesy Ian Ligget) is a 1956-63 era freeway specification US Route shield.  This blog will explore in brief how the Golden State Freeway was developed as US Route 99 and US Route 6 before becoming solely Interstate 5.   This blog is part of the larger Gribblenation US Route 99 Page.  For more information pertaining to the other various segments of US Route 99 and it's three-digit child routes check out the link the below. Gribblenation US Route 99 Page Part 1; visiting the US Route 99 shield at the Ventura Freeway/Golden State Freeway Interchange As noted in the introduction the US Route 99 shield can be seen on the eastbound Ventura Freeway (California Sta...