I took a Flag Day road trip west to check out progress on I-74 around High Point and, along the way, see if any progress had been made since my last trip with resigning I-40 through Greensboro.

I-40 Greensboro Signing
I thought the road closures the last 2 weekends between the I-85 loop west to Death Valley would allow for replacement of some of the ground-mounted signage, along with repaving of the road. Sadly, that was not true. Everything that had not been changed as of 3 weeks ago is still the same. This is also true of the signage along I-40 west of the Business 85 split, still overheads with US 421 and US 421 signs accompanying I-40, though at the entrance ramps I saw, there were just I-40 shields, don't know whether this is new or not. Same story on the SW portion of the Loop, no change, but there were areas around some ground mounted exit signage were orange barrels had been placed suggesting lane closure for some future work. Disappointed, I headed down I-85 south to I-74 construction and was pleasantly surprised when looking in the rear view mirror that they had changed signage on I-85 north approaching 'The Maze'. The first sign change you come upon is this:
Notice there's a missing shield again, East [ ], I believe that was where the Business 40 shield was, or it was meant for south 421 and they discovered the error. The problem with I-40 in the middle sign was solved with adding a 'To', the left sign is new with Sanford now being a control city. The next sign solves some of the problems of the previous one:
Here you can clearly see where the 'To Business 40' shield was removed. It's good to see I-73 being the first shield on a BGS. The sign shows the complete options for 'The Maze':
Again, with the Exit 120A sign updated by removing the Business 40 reference. The last sign:
Shows that while there may not be a true I-85/I-73 opposite multiplex, there is a longer one with US 421 and I-85. The other signage indicating to get to US 220 south by using Business 85 had not been updated with I-73 signage. At least one of the on-ramps west of US 421 (S. Elm/Eugene St.) now had I-85/US 421 signs, no I-40 signs at all.

As for I-74 construction. The newspaper report earlier this week indicated the project was ahead of schedule. This is more obvious in some places than in others. The view from the Tuttle Road bridge, the first bridge to be completed, shows definite signs of progress:
View looking eastbound, at least a couple layers of asphalt have been laid down. In contrast, the view from the latest bridge to be completed, Poole Road, shows more progress is needed:
They are just starting on the final bridge of the first section of construction, that at the Cedar Square Road interchange:
A new road will be built south of the existing one to take traffic over I-74/US 311. There was some progress to be seen on the flyover ramp from I-74 east to I-85 north. Going under the bridge on I-85 North shows that it looks largely complete:
While a view of the flyover ramp shows progress as well since my last visit:
Notice how the ramps in view, as well as that from the flyover to I-85 have been paved. The pavement extends about 1/4 mile to the east. They have also paved the western side of the NC 62 bridge, and I assume the rest will be paved shortly. For photos of this bridge and other photos of I-74 construction, go to Segments 6 and 7 HERE, I hope to have all the new photos up by the end of the week.

Comments

Bob Malme said…
An update. Based on a post in the Urban Planet's Triad area blog from yesterday, NCDOT has begun changing the signs at least at the intersections along the SW part of the Loop. The problem the poster noted is that they simply changed shields, not directions. I-40 was replaced by I-73 and then a US 421 was put in I-73's place. The problem though now is the sign reads 'East I-73 South US 421 to I-85.' They'll have to send someone back to fix the mistake, hopefully soon.

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...