Skip to main content

A Pre-Thanksgiving Sign-Seeing Road Trip

I hear there have been some complaints about the lack of sign photos here lately. I took a trip to the Greensboro and High Point areas today (11/23) to help remedy the situation. The goals of the trip were to a) see what progress NCDOT has been making in restoring I-40 to its original alignment, b) check out the new interchange that opened this weekend for the PTI Airport from Bryan Blvd. (Future I-73) and the resulting signage, and c) confirm an e-mail sent to me that NCDOT had resumed its sign installation along the original US 311 freeway, putting up new exit signs with I-74 mileposts.

First, the I-40 situation. There was a NCDOT announcement last week they were closing lanes at the once and future I-40/85 split east of Greensboro for sign installation. I can confirm the signs were changed but they were simple shield and control city switches on the existing signs, not new ones. As shown here:
You can see High Point has replaced Winston-Salem for I-85 South. Here's a photo of the signs at the actual split:
Here Winston-Salem was just greened out. The sign saying for US 421 use Exit 131 is still there. Nothing else had changed along I-40's route with Business 85. After the split though, actual interstate shields have replaced the previous Business 40 signs:
The mile-marker beyond in the photo is still is for Business 40. Also I saw only one replacement I-40 shield, going eastbound, that was not accompanied by a US 421 sign. Guess another crew is responsible for removing those. The signs at the I-73/840 exit were not changed, nor signs along the southern part of the loop.

Second, the new PTI Airport interchange. This will be the only exit off of I-73 while on Bryan Blvd. NCDOT approved plans last month to create a new alignment for I-73 that will take it north of Bryan Blvd. west of the interchange to NC 68. The first exit sign for the new interchange appears after the merge from the Greensboro loop ramp to Bryan Blvd. West:
A new third lane on Bryan Blvd becomes the exit only lane for the interchange. Old Oak Ridge Road is where the FedEx hub offices will be located. Trucks coming to and from that facility will use this interchange as well. Here's the look at the interchange signage itself:
Further up the ramp is where traffic will split between the FedEx Hub and PTI Airport:
I was able to turn around before getting to the airport on the roadway that leads to the rental car facilities. The signs created for the airport have similar information to those of NCDOT, that since I-73 is a future route, it cannot appear on overhead signs, so for now departing traffic has a choice between To NC 68 on Bryan Blvd West'', or ''To I-40 on Bryan Blvd East''. Here's an airport sign:
And here's an example of the NCDOT signage:
For signage on Bryan Blvd itself, visit my I-73 Segment 4 page.

Finally, the new signage on US 311. According to contract documents for the US 311/I-74 freeway (High Point East Belt) being constructed that started at what is now the Business 311 exit, signage for the remaining exits to the east would be updated along with those on the new highway to include I-74 milepost numbers with the existing highway west to I-40 signed as Future I-74. NCDOT started the project in the summer by putting up sign poles, but then no work was done for three months. I thought the work may wait until the construction on the new freeway project was done in 2011, but it started again last week. First putting up new gore signs with I-74 mile numbers and now starting to put up new exit signs. They have only accomplished this for 2 of the exits so far. Going westbound, the first I-74 exit number you see is here:
This is for NC 66. The first new BGS is for the next exit, High Point Road:
High Point Road is the old alignment for US 311. Here's a photo showing new numbers at the exit ramp:
For now, the last new exit signs are for Union Cross Road, this accesses the Dell company facility:
This will be the last exit on the US 311 freeway when the Winston-Salem Northern Beltway is completed, however, for now NCDOT is temporarily extending I-74 mileage to the existing exit for I-40. They could thus sign the freeway as I-74 (or Future I-74) since it will connect to an interstate. Here's the gore sign for the Ridgewood Road exit (Exit 56) that would be after the Beltway interchange, the exit for I-40 is Exit 55 (not pictured):
As to when the signing of the road as I-74 will occur. At each US 311 sign there are posts to place an I-74/US 311 sign, see photo below. A couple have old sign pieces connecting the poles. NCDOT typically uses these as placeholders for a future sign. Whether these signs will appear soon or in 2011, I guess we'll have to wait and see.
I have posted these photos and others on my I-74 Segment 5 page.

I also took some time to explore construction progress on the US 311/I-74 freeway, including the I-85/I-74 interchange. That will be the subject of a future post.

Comment: With the new exit signs on US 311 in Forsyth County there are now two sets of exit numbers from I-40 to Business 85. From west to east these are 55 to 63, then 25 to 19. Not only are these numbers far apart, they go in opposite directions. The original contract called for the renumbering of Exits 25 to 19 as 65 to 71. For consistencies sake, hopefully they will do this soon after completing the work on the mile 55 to 63 section.

Comments

Anonymous said…
This comment has been removed by a blog administrator.
Bob Malme said…
In regards to my comment on US 311 exit numbering. NCDOT solved that problem in early December by changing all the exit numbers along the new stretch of highway from Business 311 to Business 85. The exits for the entire open freeway eastbound from I-40 run now from 55 to 71B. They also put up Future I-74 signs along the whole Segment 5 stretch. Check the link in the original post for photos of them plus also Segment 6 for photos of the signs with the new exit numbers at the bottom of the page.

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...