Skip to main content

Triangle Expressway Toll Rate - 13.5 cents per mile

According to a recent article in Toll Road News, the North Carolina Turnpike Authority has announced a 13.5 cents per mile toll rate on the yet to be built 19 mile Triangle Expressway.

The toll rates are listed for electronic cashless transponders (like EZ-Pass) which will be the primary source of collection on the proposed toll road.

There will be four mainline toll plazas on the highway charging various tolls. Beginning with a toll plaza near the current NC 540 interchange with Davis Drive (Exit 68) 50c, 60c, 75c, and 30c tolls will be charged at each successive toll plaza. In addition, tolls from 25 cents to 75 cents will be charged at various on and onramps. For a more detailed view of the proposed toll schedule see below:

Source: Toll Roads News

The toll rate again is for those with transponders. If you do not own a transponder, the tolls can be two or three times the 13.5 rate depending on how you are registered. Since the Triangle Expressway will be a automated toll road, there is no traditional human-operated toll booths on the highway, tolls will either be collected by transponders or by mailed billing via video registration. Motorists who have registered their vehicles and addresses for video registration could face a toll twice the amount of those with a transponder. Those traveling the highway that are not registered (out of state vehicles, rental cars, etc) may face a charge of three times the 13.5 cent per mile toll.

Currently, Turnpike Officials hope to have the highway open in 2010. However, there is still the problem of gap financing plaguing the final construction of the highway. Until the legislature approves funding from either the highway trust fund or general fund to cover the remaining cost of the highway, the Triangle Expressway will remain a dotted line.

Comments

Bob Malme said…
The gap funding may come soon, if the proposals of the governor's 21st
Century Transportation Committee are approved. They are proposing ending
the practice of transferring $172 million annually from the Highway Trust
Fund to the state's General Fund. About $75 million of which would go to
the Turnpike Authority. See:
http://www.wral.com/news/news_briefs/story/2789331/

Popular posts from this blog

Grand Loop Road of Yellowstone National Park

  Grand Loop Road is a 140 mile loop highway which traverses the interior of Yellowstone National Park.  Grand Loop Road connects all of the major attractions and geological features of Yellowstone National Park along with the entrance roads.  Grand Loop Road is a seasonal highway and despite some conjecture never has been part of the US Route System.   Part 1; the history of Grand Loop Road The majority of history pertaining to Grand Loop Road was taken from the below National Park Service article: Historic Roads - Yellowstone National Park (U.S. National Park Service) (nps.gov) Yellowstone was declared the first National Park of the United States on March 1st, 1872.  The first real highway to access Yellowstone National Park came in 1873 when a tolled facility was constructed from Bozeman, Montana via Yankee Jim Canyon to Mammoth Hot Springs.  Numerous attempts were made to fund construction of roadway infrastructure during the early years of Yellows...

The last 1956-63 era California Sign State Route Spade?

Along southbound California State Route 170 (the Hollywood Freeway Extension) approaching the Hollywood Freeway/Ventura Freeway interchange a white California State Route 134 Sign State Route Spade can be observed on guide sign.  These white spades were specifically used during the 1956-63 era and have become increasingly rare.  This blog is intended to serve as a brief history of the Sign State Route Spade.  We also ask you as the reader, is this last 1956-63 era Sign State Route Spade or do you know of others?  Part 1; the history of the California Sign State Route Spade Prior to the Sign State Route System, the US Route System and the Auto Trails were the only highways in California signed with reassurance markers.  The creation of the US Route System by the American Association of State Highway Officials during November 1926 brought a system of standardized reassurance shields to major highways in California.  Early efforts to create a Sign State Route ...

California State Route 70; the Feather River Highway

From 2017 through to early 2019 I drove the majority of the California State Route 70; the Feather River Highway from CA 89 southwest to CA 99. CA 70 is an approximately 178.5 mile state highway which starts at US 395 near the Nevada State Line and travels west through the Feather River Canyon to CA 99.  CA 70 is often referred to as the Feather River Highway" given it's close association with the river.  Historically CA 70 was previously signed as US 40A and CA 24.  The Legislative Routes prior to the 1964 California Highway Renumbering that made up the current route of CA 70 are as follows: -  Legislative Route Number 21 from US 395 westward to Oroville. -  LRN 87 from Oroville south to Marysville. -  LRN 232 from Marysville to the current junction with CA 99.  CA 70 was even dual signed with CA 99 into Sacramento on what was LRN 232 for a time. The change from US 40A/LRN 21/LRN 87/LRN 232 can be seen by comparing the 1963 State Highway Ma...